Abstract

The purpose of this study was to determine the relationship between human characteristics and adoption of project management information system (PMIS) in non-governmental organizations’ projects in Nakuru Town. The independent variable (Human characteristics) was conceptualized into; resistance to change, project management skills, user’s skills and awareness, power struggles and perfectionism. These indicators were individually related with adoption of project management information system. This study adopted both descriptive and correlational design. It was a survey and primary data was collected through structured questionnaires and interviews. Both descriptive and inferential analysis was employed in this study. The research findings were presented through tables. The research findings revealed that one’s competence level in using PMIS, level of training received, willingness to adapt to using PMIS, attitude towards technology and own expectation when using PMIS are positively related with adoption of project management information system. Attitudinal change and support in using the system also appeared to hugely influence adoption of PMIS. The study underscored the analogy that before the management puts pressure on using the system, they must first adopt its usage then spiral it down to subordinates. The study recommended that mentorship and training are critical drivers to successful implementation of PMIS. Training not only should be at the initiation phase of the system but embedded as a continuous skill enhancement and as part of professional development in the organization. A part from training, employees must be motivated and involved at all stages of the implementation process.

Published in International Journal of Intelligent Information Systems (Volume 4, Issue 1)
DOI 10.11648/j.ijiis.20150401.13
Page(s) 16-26
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Human Characteristics, Project Management Information System, Non-governmental Organizations

References
[1] Ackerman, M. S. (2000). The intellectual challenge of CSCW; The gap between social requirements and technical feasibility. Human-Computer Interaction,15 (2),179-203.
[2] Adams, D. A., Nelson, R. R. & Todd, P. A. (1992). Perceived usefulness, ease of use, and usage of information technology: A replication. MIS Quarterly. 16(2), 227-248.
[3] Ahlemann F. (2008), Project management Software Systems Requirements, Selection Processes and Products, 5th edition. Wurzburg: BARC.
[4] Ajzen, I. (1985). From intentions to actions: A theory of planned behavior. In J. Kuhl & J. Beckman (Eds.), Action-control: From cognition to behavior (pp. 11-39). Heidelberg: Springer Press.
[5] Ajzen, I.; and Fishbein, M. Understanding Attitudes and Predicting Social Behavior. Englewood Cliffs, NJ: Prentice-Hall, 1980.
[6] Anderson, Eugene W. and Mary W. Sullivan (1993), “The Antecedents and Consequences of Customer Satisfaction for Firms,” Marketing Science, 16 (2), 129-45.
[7] Baccarini, D 1999, 'The Logical Framework Method for Defining Project Success', Project Management Journal, vol. 30, no. 4, pp. 25-32.
[8] Bergeron, F., Raymond, L., Rivard, S. & Gara, M. F. (1995). Determinants of EIS use: testing a behavioral model. Decision Support System, 14 (1), 131-146.
[9] Brandon, D. (2002). Issues in the globalization of electronic commerce. In V. K. Murthy & N. Shi (Eds.), Architectural issues of Web-enabled electronic business. Hershey, PA: Idea Group Publishing.
[10] Brandon, D. (2004). Project performance measurement. In P. Morris & J. Pinto (Eds.), The Wiley guide to managing projects. New York: Wiley.
[11] Burgelman R.A., Maidique M.A. and Wheelwright S.C. 1996. ‘Strategic Management of Technology and Innovation’. Irwin. Chicago. USA. Second Edition.
[12] Burke, R. J. 2001a, 'Spence and Robbins' Measures of Workaholism Components: Test-Retest Stability', Psychological Reports, Vol. 88, no. pp. 882-888.
[13] Caldwell, R. (2004). Project Management Information System: Guidlines for Planning, Implementing, and Managing a DME Project Information System. New York: CARE Press.
[14] Cleland, D. I. (2004a). Field Guide to Project Management (2nd ed.). New York: McGraw-Hill Press.
[15] Cleland, D. I. (2004b). Project Management Information System in Project Management: Strategic Design and Implementation (5th ed.). New York: McGraw-Hill Press.
[16] Clements, J. P. & Gido, J. (2006). Effective Project Management. Canada: Thomson South-Western.
[17] Cochran WG. Sampling Techniques. John Wiley & Sons:New York, 1977. pp.74-76.
[18] Cragg, P. B. and King, M. (1993). Small-Firm Computing: Motivators and Inhibitors. MIS Quarterly, 17 (1): 47-60.
[19] Dabholkar, P. A. and Bagozzi, R. (2002) An Attitudinal Model of Technology-Based Self-Service: Moderating Effects of Consumer Traits and Situational Factors, Journal of the Academy of Marketing Science, 30 (3), pp. 184-201.
[20] Davis, F. D. (1989). Perceived usefulness, perceived ease of use, and user acceptance of Information technology. MIS Quarterly. 13(3), 319-339.
[21] Davis, F.D., Bagozzi, R.P. & Warshaw, P.R. 1989, " User acceptance of computer technology: a comparison of two theoretical models.", Management Science, vol. 35, no. 8, pp. 982–1003.
[22] DeLone, W.H., and Mclean, E.R. (1992), Information Systems Success: The Quest for the Dependent Variable, Information Systems Research, 3(1), 6095.
[23] DeLone, W.H., and Mclean, E.R. (2003), The DeLone and McLean Model of Information Systems Success: A TenYear Update, Journal of Management Information Systems, 19(4), 930.
[24] Dishaw, M. T. & Strong, D. M. (1998a). Experience as a Moderating Variable in a Task-Technology Fit Model Presented at the Fourth Americas Conference on Information Systems. Baltimore.
[25] Dishaw, M.T. & Strong, D. M. (1998b). Supporting Software Maintenance with Software Engineering Tools: A Computed Task-Technology Fit Analysis. Journal of Systems and Software, 44, 107-120.
[26] Fenech, T. (1998).Using Perceived Ease of Use and Perceived Usefulness to Predict Acceptance of the World Wide Web. Computer Networks and ISDN Systems, 30 (7), 629-630.
[27] Gabber, E., The Case Against User-level NetworkingProceedings of the Third Annual Workshop on System-Area Networks (SAN-3), February 2004, Madrid Spain.
[28] Garson, G. D. (2008). Multiple regression. Retrieved January 28, 2008, from http://www2.chass.ncsu.edu/garson/pa765/regress.htm
[29] GoK (2004b). Nakuru district strategic plan. Nakuru. Government of Kenya.
[30] Goodhue, D. L. & Thompson, R. L. (1995). Task-Technology Fit and Individual Performance. MIS Quarterly, 19 (2), 213-236.
[31] Goodhue, D. L. (1995). Understanding User Evaluations of Information Systems. Management Science, 41(12), 1827-1844.
[32] Gupta, A. (2000) Enterprise resource planning: the emerging organizational value systems, Industrial Management & Data Systems, April, 2000, Volume 100, Issue 3, p114-118.
[33] Havelka, D., & Rajkumar, T.M. (2006), Using the troubled project recovery framework: Problem recognition and decision to recover. eService.Journal, 5(1), 4373.
[34] Herroelen W. (2005), Project scheduling theory and practice. Prod Oper Manage, 14(4):41332.
[35] Huber, G. P. (1990) „A Theory of the Effects of Advanced Information Technologies on Organizational Design, Intelligence, and Decision Making”, The Academy of Management Review 15 (1), pp. 47-71.
[36] Hundley, R., et al. (2004). The global course of the information revolution: recurring themes and regional variations. Retrieved from www.rand.org/publications/MR/ MR1680/
[37] Information Technology: Toward a Unified View. MIS Quarterly. 27(3), 425-478.
[38] Kothari, C.R.,1985, Research Methodology- Methods and Techniques, New Delhi, Wiley Eastern Limited.
[39] Kwon, T. H.; and Zmud, R. W. "Unifying the Fragmented Models of Information Systems Implementation." In J. R. Boland, and R. Hirshheim (eds.), Critical Issues in Information Systems Research, New York: John Wiley, 1987, pp. 227-251.
[40] Laudon, K., & Laudon, J. P. (2009). Management Information Systems (11th ed.). New York: Pearson press.
[41] Light M, Rosser B, Hayward S. (2005), Realizing the benefits of projects and portfolio management. Gartner, Research ID G00125673, 131.
[42] Maciaszek, L. A. (2001). Requirements analysis and system design: Developing information systems with UML. Harlow: Addison-Wesley Press.
[43] Maguire, S. (2000) Towards a “business-led” approach to Information Systems development, Information Management & Computer Security, December, 2000, retrieved May 10th 2006, from: http://www.emeraldinsight.com.
[44] Magutu et.al (2010), “Management Through Effective Information Quality Management (IQM) in Banking Services”,AJBUMA Vol.1pp.96-111.
[45] Mathieson, K. (1991). Predicting user intentions: Comparing the Technology Acceptance Model with the Theory of Planned Behavior. Information Systems Research. 2(3), 173-191.
[46] Meredith, J. R., & Mantel, S. J. (2006). Project management: A managerial approach (6th ed.). New York: Wiley.
[47] Mgaya, R. J. (1999). Adoption and diffusion of group support systems in Tanzania. Netherlands: Delft University of Technology Press.
[48] Model with the Theory of Planned Behavior. Information Systems Research. 2(3), 173-191.
[49] Moran, C. R. (1998). Strategic information technology planning in higher education: A new roadmap to the 21st century academy. Bolton: Anker Publishing Press.
[50] Mugenda, O. & Mugenda. A. (2003). Research methods Quantitative and Qualitative Approaches. Nairobi acts Press.
[51] Mugonyi, D. (2003). US queries new computer deal. General format. Retrieved from http://www.nationaudio.com/News/DailyNation/03092003/News/News81.html
[52] Muma, B. O., Nyaoga, B. R., Matwere, B. R. and Nyambega, E. K. (2014). Green Supply Chain Management and Environmental Performance among Tea Processing Firms in Kericho County, Kenya. International Journal of Economics, Finance and Management Science 2(5) 270-276
[53] Muma, B. O., Nyaoga, R. B., Matwere, R. B. and Onyango J. O. (2014). Green Supply Chain Management and Economic Performance: A Review of Tea Processing Firms in Kericho and Bomet Counties, Kenya. International Journal of Science and Research, 3 (11), 2319-7064
[54] Ndou, V. (2004). E-Government for developing countries: Opportunities and challenges. General format. Retrieved from http://www.is.cityu.edu.hk/research/ejisdc/vol18/v18r1.pdf edn.
[55] Odedra, M. (1993). Information technology policies and applications in the commonwealth countries. London: Commonwealth secretariat.
[56] Oliver, Richard L. (1980), “A Cognitive Model of the Antecedents and Consequences of Satisfaction Decisions,” Journal of Marketing Research, 17 (3), 460-469.
[57] Oliver, Richard L. (1993), “Cognitive, Affective, and Attribute Bases of the Satisfaction Response,” Journal of Consumer Research, 20 (3), 418-430.
[58] Oruma, B. W., Mironga, J. M. and Muma, B. O. (2014). Top Management Commitment Towards Implementation of Total Quality Management (TQM) in Construction Companies in Nakuru County-Kenya. International Journal of Economics, Finance and Management Sciences. Vol. 2, (6),332-338
[59] Peter Drucker (2004, January). What makes an effective Executive. Harvard Business review
[60] Pinkerton, WJ 2003, Project management: achieving project bottom-line success, McGraw-Hill, New York.
[61] PMI (2008). A Guide to the Project Management Body of Knowledge: PMBOK Guide (3rd ed.). Pennsylvania: Project Management Institute Press.
[62] Omware Q., Nyonje, R. and Muma B. (2014). Determinants of Quality Management Practices in Kenyan Sugar Processing Industry: A Case of Chemelil Sugar Company, Kisumu County, Kenya. International Journal of Economics, Finance and Management Science.
[63] Support System Effectiveness”, MIS Quarterly 22 (3), pp. 313-334.
[64] Tuman, J. J. (1988). Development and Implementation of Project Management systems. New York: Van Nostrand Reinhold Press.
[65] Turner, J. R. (1999). The Handbook of Project Based Management 2nd ed.). Maidenhead Berkshire: McGraw-Hill.
[66] Van der Meijden, M. J., Tange, H. J., Troost, J. & Hasman, A. (2003). Determinants of success of inpatient clinical information systems: a literature review. Med inform Associate, 10 (3), 235-243.
[67] Van Der Westhuizen, D. & Fitzgerald, E.P. (2005). Defining and measuring project success. Proceedings of the European Conference on IS Management, Leadership and Governance. Reading, UK.
[68] Venkatesh, V.; Morris, M. G.; Davis, G. B. & Davis F. D. (2003). User Acceptance of Information Technology: Toward a Unified View. MIS Quarterly. 27(3), 425-478.
[69] World Bank report (2008) World poverty index (Revised), Ministry of planning and Development (GoK).
[70] Yates, J. (2000, August). Origins of project management. Knowledge Magazine.
[71] Zigurs, I., and B. K. Buckland (1998) “A Theory of Task-Technology Fit and Group Support System Effectiveness”, MIS Quarterly 22 (3), pp. 313-334.
Cite This Article
  • APA Style

    Oyugi Tobias, Maina Kairu. (2015). Relationship between Human Characteristics and Adoption of Project Management Information System in Non-Governmental Organizations’ Projects in Nakuru Town (Kenya). International Journal of Intelligent Information Systems, 4(1), 16-26. https://doi.org/10.11648/j.ijiis.20150401.13

    Copy | Download

    ACS Style

    Oyugi Tobias; Maina Kairu. Relationship between Human Characteristics and Adoption of Project Management Information System in Non-Governmental Organizations’ Projects in Nakuru Town (Kenya). Int. J. Intell. Inf. Syst. 2015, 4(1), 16-26. doi: 10.11648/j.ijiis.20150401.13

    Copy | Download

    AMA Style

    Oyugi Tobias, Maina Kairu. Relationship between Human Characteristics and Adoption of Project Management Information System in Non-Governmental Organizations’ Projects in Nakuru Town (Kenya). Int J Intell Inf Syst. 2015;4(1):16-26. doi: 10.11648/j.ijiis.20150401.13

    Copy | Download

  • @article{10.11648/j.ijiis.20150401.13,
      author = {Oyugi Tobias and Maina Kairu},
      title = {Relationship between Human Characteristics and Adoption of Project Management Information System in Non-Governmental Organizations’ Projects in Nakuru Town (Kenya)},
      journal = {International Journal of Intelligent Information Systems},
      volume = {4},
      number = {1},
      pages = {16-26},
      doi = {10.11648/j.ijiis.20150401.13},
      url = {https://doi.org/10.11648/j.ijiis.20150401.13},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ijiis.20150401.13},
      abstract = {The purpose of this study was to determine the relationship between human characteristics and adoption of project management information system (PMIS) in non-governmental organizations’ projects in Nakuru Town. The independent variable (Human characteristics) was conceptualized into; resistance to change, project management skills, user’s skills and awareness, power struggles and perfectionism. These indicators were individually related with adoption of project management information system. This study adopted both descriptive and correlational design. It was a survey and primary data was collected through structured questionnaires and interviews. Both descriptive and inferential analysis was employed in this study. The research findings were presented through tables. The research findings revealed that one’s competence level in using PMIS, level of training received, willingness to adapt to using PMIS, attitude towards technology and own expectation when using PMIS are positively related with adoption of project management information system. Attitudinal change and support in using the system also appeared to hugely influence adoption of PMIS. The study underscored the analogy that before the management puts pressure on using the system, they must first adopt its usage then spiral it down to subordinates. The study recommended that mentorship and training are critical drivers to successful implementation of PMIS. Training not only should be at the initiation phase of the system but embedded as a continuous skill enhancement and as part of professional development in the organization. A part from training, employees must be motivated and involved at all stages of the implementation process.},
     year = {2015}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Relationship between Human Characteristics and Adoption of Project Management Information System in Non-Governmental Organizations’ Projects in Nakuru Town (Kenya)
    AU  - Oyugi Tobias
    AU  - Maina Kairu
    Y1  - 2015/02/06
    PY  - 2015
    N1  - https://doi.org/10.11648/j.ijiis.20150401.13
    DO  - 10.11648/j.ijiis.20150401.13
    T2  - International Journal of Intelligent Information Systems
    JF  - International Journal of Intelligent Information Systems
    JO  - International Journal of Intelligent Information Systems
    SP  - 16
    EP  - 26
    PB  - Science Publishing Group
    SN  - 2328-7683
    UR  - https://doi.org/10.11648/j.ijiis.20150401.13
    AB  - The purpose of this study was to determine the relationship between human characteristics and adoption of project management information system (PMIS) in non-governmental organizations’ projects in Nakuru Town. The independent variable (Human characteristics) was conceptualized into; resistance to change, project management skills, user’s skills and awareness, power struggles and perfectionism. These indicators were individually related with adoption of project management information system. This study adopted both descriptive and correlational design. It was a survey and primary data was collected through structured questionnaires and interviews. Both descriptive and inferential analysis was employed in this study. The research findings were presented through tables. The research findings revealed that one’s competence level in using PMIS, level of training received, willingness to adapt to using PMIS, attitude towards technology and own expectation when using PMIS are positively related with adoption of project management information system. Attitudinal change and support in using the system also appeared to hugely influence adoption of PMIS. The study underscored the analogy that before the management puts pressure on using the system, they must first adopt its usage then spiral it down to subordinates. The study recommended that mentorship and training are critical drivers to successful implementation of PMIS. Training not only should be at the initiation phase of the system but embedded as a continuous skill enhancement and as part of professional development in the organization. A part from training, employees must be motivated and involved at all stages of the implementation process.
    VL  - 4
    IS  - 1
    ER  - 

    Copy | Download

Author Information
  • Department of Education and External studies, University of Nairobi, Nairobi, Kenya

  • Department of Education and External studies, University of Nairobi, Nairobi, Kenya

  • Sections