Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model

Received: 03 January 2017    Accepted: 18 January 2017    Published: 27 June 2017
Views:       Downloads:

Share This Article

Abstract

In this paper time series modeling and forecasting of industrial electricity consumption in Nigeria is presented. Specifically, Harvey Model and Autoregressive Model, (AR) are used. The data used are obtained from Central Bank of Nigeria (CBN) Statistical Bulletin for industrial electricity consumption ranging from 1979 – 2014. The results shows that Harvey Model has (r2) = 80.1% and RMSE = 65.2513 whereas Autoregressive Model has (r2) = 50.1% and RMSE = 71.3985. Obviously, Harvey model has better prediction accuracy than the AR model. The Harvey model was then used to forecast industrial electricity consumption in Nigeria for the next 15 years (from 2015 to 2029). According to the forecast result by the year 2029 the industrial consumption of Nigeria will stand at 539.65 MW/h as against 468.18 MW/h in 2015.

DOI 10.11648/j.ijepe.20170603.14
Published in International Journal of Energy and Power Engineering (Volume 6, Issue 3, June 2017)
Page(s) 40-46
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Time Series Analysis, Industrial Electricity Consumption, Forecasting, Harvey Model, Autoregressive Model

References
[1] Nachet, S., & Aoun, M. C. (2015). The Saudi electricity sector: pressing issues and challenges.
[2] Belt, J. (2009). The electric power sector in Cuba: Potential ways to increase efficiency and sustainability. In Cuba’s Energy Future: Strategic Approaches to Cooperation. Brookings Washington.
[3] Lin, B. Q. (2003). Electricity demand in the People's Republic of China: investment requirement and environmental impact.
[4] Matek, B., & Gawell, K. (2015). The benefits of baseload renewables: a misunderstood energy technology. The Electricity Journal, 28 (2), 101-112.
[5] Swaroop, R., & HUSSEIN, A. A. (2012). Load Forecasting For Power System Planning And Operation Using Artificial Neural Network At Al Batinah Region Oman. Journal of Engineering Science and Technology, 7 (4), 498-504.
[6] Fahad, M. U., & Arbab, N. (2014). Factor Affecting Short Term Load Forecasting. Journal of Clean Energy Technologies, 2 (4), 305-309.
[7] Paul, R. (2015). Load Forecasting Using Linear Regression And Artificial Neural Networks (Doctoral dissertation, NATIONAL INSTITUTE OF TECHNOLOGY WARANGAL).
[8] Feinberg, E. A., & Genethliou, D. (2005). Load forecasting. In Applied mathematics for restructured electric power systems (pp. 269-285). Springer US.
[9] BHARDWAJ, S. (2014). ANALYSING LOAD FORECASTING TECHNIQUES (Doctoral dissertation, VIT University VELLORE).
[10] Demir, A. (2014). Elaboration of Electricity Energy for Production-Consumption Relation of Northern-Iraq for the Future Expectations. International Journal of Academic Research in Economics and Management Sciences, 3 (5), 101.
[11] Özdemir, V. (2014). A Future Projection of Turkey's Energy Intensity. Energy Sources, Part B: Economics, Planning, and Policy, 9 (1), 1-8.
[12] Kniivilä, M. (2007). Industrial development and economic growth: Implications for poverty reduction and income inequality. Industrial Development for the 21st Century: Sustainable Development Perspectives, 295-333.
[13] Shihab, M. (2001). Economic Development in the UAE. United Arab Emirates: a new perspective, 249-59.
[14] Ackah, C., Adjasi, C., & Turkson, F. (2014). Scoping study on the evolution of industry in Ghana. World Institute for Development Economics Research (WIDER) working paper No, 75, 1-40.
[15] Ogunleye, E. K. (2016). Political economy of Nigerian power sector reform (No. UNU-WIDER Research Paper wp2016-009). World Institute for Development Economic Research (UNU-WIDER).
[16] Awosope, C. A. (2015). Nigeria Electricity Industry: Issues, Challenges and Solutions.
[17] Odior, A. O., Oyawale, F. A., & Ovuworie, G. C. (2010). Some operations of electric power supply system in Benin City area of Nigeria. Am J Sci Ind Res, 1 (3), 636-642.
[18] Fischer, M. (2008). Modeling and Forecasting energy demand: Principles and difficulties, In Management of Weather and Climate Risk in the Energy Industry, Troccoli, A. (Ed.), pp. 207-226, 2008.
[19] Feinberg, E. A., & Genethliou, D. (2005). Load forecasting. In Applied mathematics for restructured electric power systems (pp. 269-285). Springer US.
[20] Schellong, W. (2011). Energy demand analysis and forecast. INTECH Open Access Publisher.
[21] Oyelami, B. O., & adedoyin Adewumi, A. (2014). Models for Forecasting the Demand and Supply of Electricity in Nigeria. American Journal of Modeling and Optimization, 2 (1), 25-33.
[22] Mohamed, Z., & Bodger, P. (2005). A comparison of Logistic and Harvey models for electricity consumption in New Zealand. Technological Forecasting and Social Change, 72 (8), 1030-1043.
[23] Roken, R. M., & Badri, M. A. (2006). Time Series Models for Forecasting Monthly Electricity Peak Load for Dubai. Chancellor's Undergraduate Research Award.
[24] Nedzingahe, L. (2010). Forecasting models for operational and tactical requirements in electricity consumption: The case of the Ferrochrome Sector in South Africa (Doctoral dissertation, University of Limpopo (Medunsa Campus)).
[25] Nowicka-Zagrajek, J., & Weron, R. (2002). Modeling electricity loads in California: ARMA models with hyperbolic noise. Signal Processing, 82 (12), 1903-1915.
[26] Hinman, J., & Hickey, E. (2009). Modeling and forecasting short-term electricity load using regression analysis. Journal of IInstitute for Regulatory Policy Studies [электронный ресурс].
[27] Weron, R., & Misiorek, A. (2005, May). Forecasting spot electricity prices with time series models. In Proceedings of the European Electricity Market EEM-05 Conference (pp. 133-141).
[28] Cho, H., Goude, Y., Brossat, X., & Yao, Q. (2013). Modeling and forecasting daily electricity load curves: a hybrid approach. Journal of the American Statistical Association, 108 (501), 7-21.
[29] Roken, R. M., & Badri, M. A. (2006). Time Series Models for Forecasting Monthly Electricity Peak Load for Dubai. Chancellor's Undergraduate Research Award.
[30] National Bureau of Statistics (2014). “Nigerian Gross Domestic Product Report, Quarter two 2014”, Abuja–Nigeria.
Author Information
  • Department of Electrical/Electronic and Computer Engineering, University of Uyo, Nigeria

  • Department of Physic, University of Uyo, Uyo, Nigeria

  • Department of Electrical/Electronic Engineering, Akwa Ibom State Polytechnic, Ikot Osura Ikot Ekpene, Nigeria

Cite This Article
  • APA Style

    Ogungbemi Emmanuel Oluropo, Edet Joseph Archibong, Nsikak John Affia. (2017). Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model. International Journal of Energy and Power Engineering, 6(3), 40-46. https://doi.org/10.11648/j.ijepe.20170603.14

    Copy | Download

    ACS Style

    Ogungbemi Emmanuel Oluropo; Edet Joseph Archibong; Nsikak John Affia. Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model. Int. J. Energy Power Eng. 2017, 6(3), 40-46. doi: 10.11648/j.ijepe.20170603.14

    Copy | Download

    AMA Style

    Ogungbemi Emmanuel Oluropo, Edet Joseph Archibong, Nsikak John Affia. Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model. Int J Energy Power Eng. 2017;6(3):40-46. doi: 10.11648/j.ijepe.20170603.14

    Copy | Download

  • @article{10.11648/j.ijepe.20170603.14,
      author = {Ogungbemi Emmanuel Oluropo and Edet Joseph Archibong and Nsikak John Affia},
      title = {Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model},
      journal = {International Journal of Energy and Power Engineering},
      volume = {6},
      number = {3},
      pages = {40-46},
      doi = {10.11648/j.ijepe.20170603.14},
      url = {https://doi.org/10.11648/j.ijepe.20170603.14},
      eprint = {https://download.sciencepg.com/pdf/10.11648.j.ijepe.20170603.14},
      abstract = {In this paper time series modeling and forecasting of industrial electricity consumption in Nigeria is presented. Specifically, Harvey Model and Autoregressive Model, (AR) are used. The data used are obtained from Central Bank of Nigeria (CBN) Statistical Bulletin for industrial electricity consumption ranging from 1979 – 2014. The results shows that Harvey Model has (r2) = 80.1% and RMSE = 65.2513 whereas Autoregressive Model has (r2) = 50.1% and RMSE = 71.3985. Obviously, Harvey model has better prediction accuracy than the AR model. The Harvey model was then used to forecast industrial electricity consumption in Nigeria for the next 15 years (from 2015 to 2029). According to the forecast result by the year 2029 the industrial consumption of Nigeria will stand at 539.65 MW/h as against 468.18 MW/h in 2015.},
     year = {2017}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Time Series Analysis of Industrial Electricity Consumption in Nigeria Using Harvey Model and Autoregressive Model
    AU  - Ogungbemi Emmanuel Oluropo
    AU  - Edet Joseph Archibong
    AU  - Nsikak John Affia
    Y1  - 2017/06/27
    PY  - 2017
    N1  - https://doi.org/10.11648/j.ijepe.20170603.14
    DO  - 10.11648/j.ijepe.20170603.14
    T2  - International Journal of Energy and Power Engineering
    JF  - International Journal of Energy and Power Engineering
    JO  - International Journal of Energy and Power Engineering
    SP  - 40
    EP  - 46
    PB  - Science Publishing Group
    SN  - 2326-960X
    UR  - https://doi.org/10.11648/j.ijepe.20170603.14
    AB  - In this paper time series modeling and forecasting of industrial electricity consumption in Nigeria is presented. Specifically, Harvey Model and Autoregressive Model, (AR) are used. The data used are obtained from Central Bank of Nigeria (CBN) Statistical Bulletin for industrial electricity consumption ranging from 1979 – 2014. The results shows that Harvey Model has (r2) = 80.1% and RMSE = 65.2513 whereas Autoregressive Model has (r2) = 50.1% and RMSE = 71.3985. Obviously, Harvey model has better prediction accuracy than the AR model. The Harvey model was then used to forecast industrial electricity consumption in Nigeria for the next 15 years (from 2015 to 2029). According to the forecast result by the year 2029 the industrial consumption of Nigeria will stand at 539.65 MW/h as against 468.18 MW/h in 2015.
    VL  - 6
    IS  - 3
    ER  - 

    Copy | Download

  • Sections