Possibilities for the Development of Flexible Planning and Production Control
Science Journal of Business and Management
Volume 2, Issue 5, October 2014, Pages: 143-152
Received: Oct. 6, 2014; Accepted: Oct. 28, 2014; Published: Oct. 30, 2014
Views 2271      Downloads 98
Author
Borislav Gordic, MIRAKO Co., Draskoviceva 57, Zagreb, University NORTH - University Center Varazdin, Department of Logistic, Varazdin, Croatia
Article Tools
Follow on us
Abstract
Based on the results of the research carried out in one production system an attempt is made to give an answer regarding the possibilities for the development of adaptive operational planning and production control, especially in terms of dynamics and mode of operation and linking of procurement, sales and production processes. Through selected criteria and measures and with adequate design of experiments and a simple simulation model, the influence factors have been defined, and by applying the analysis of variance the relative strength of their effect on the successfulness of operational planning and production control has been determined. The results obtained are a template for definition and development of the process of operational planning and production control and for the optimization of that process with the aim of meeting the maximum needs of the market through the realization in production, and achieving the highest possible success of a business enterprise, as a model of descrete periodical dynamic optimization.
Keywords
Successfulness of Operational Planning and Production Control, Influence Factors, Design of Experiments, Analysis of Variance, Flexible Planning and Control
To cite this article
Borislav Gordic, Possibilities for the Development of Flexible Planning and Production Control, Science Journal of Business and Management. Vol. 2, No. 5, 2014, pp. 143-152. doi: 10.11648/j.sjbm.20140205.15
References
[1]
T.J.Coelli; D.S. Prasada Rao; C.J. O'Donnell; G.E.Battese, "An Introduction to Efficiency and Productivity Analysis", 2. edition, Springer, NewYork, 2005.
[2]
T.E.Vollman; W.L.Berry; D.C.Whybark, "Manufacturing Planning And Control System", 4. edition, McGrow-Hill, 1997.
[3]
T. C. Miller, "Hierarchical Operations And Supply Chain Planning", Springer, New York, 2002.
[4]
M. L. Pinedo, "Planning and Scheduling In Manufacturing and Services", Springer, New York, 2004.
[5]
S. T. Hackman, "Production Economics", Krieger Publishing Co., Melbourne, Florida/US, 2007.
[6]
M. Caramia; P. Dell' Olmo, "Effective Resource Management in Manufacturing Systems: Optimization Algorithms for Production Planning", Springer, New York, 2006.
[7]
S. Voss; D. L. Woodruff; "Introduction To Computational Optimization Models For Production Planning In A Supply Chain", Springer, New York, 2002.
[8]
P. Argonato & Coautors, "Production Planning In Production Networks: Models For Medium and Short-term Planning", Springer, New York, 2008.
[9]
L.C.Hendry; B.G.Kingsman, "Production Planning System and Their Applicability to Make-to-order Companies", European Journal of Operational Research, Vol.40, pages 1-15, 1989.
[10]
N.Štefanić; N.Gjeldim; T.Mikac, "Primjena Lean koncepta u proizvodnoj djelatnosti", Tehnički vjesnik, br.17 (3) stranice 353-356, 2010.
[11]
J. J. Kanet; Martin Stoesslein, "Integrating Production Planning And Control: Towards A Simple Model For Capacitated ERP", Production Planning & Control Journal, 3/2010, pages 286-300.
[12]
D. Aprile, A. C. Garavelli, I. Giannoccaro, "Operations Planning and Flexibility in a Supply Chain", Production Planning & Control Journal, 1/2005, pages 21-31.
[13]
J. N. D. Gupta, "An Excursion in Scheduling Theory: An Overwiew of Scheduling Research in the Twentieth Century", Production Planning & Control Journal, 2/2002, pages 105-116.
[14]
G. Xue, O. F. Offodile, H. Zhou, M. D. Troutt, " Integrated Production Planning with Sequence-dependent Family Setup Times", International Journal Of Production Economics, Vol.131/2011, pages 674-681.
[15]
J. Mula, R. Poler, J. P. García-Sabater, F.C. Lario, " Models for Production Planning under Uncertainty: A Review", International Journal Of Production Economics, Vol.103/2006, pages 271-285.
[16]
T. Volling; T. S. Spengler, "Modeling and Simulation of Order-driven Planning Policies in Build-to-order Automobile Production", International Journal Of Production Economics, Vol.131/2011, pages 183-193.
[17]
J. J. Kanet; M. Stoesslein, "Integrating Production Planning And Control: Towards A Simple Model For Capacitated ERP", Production Planning & Control Journal, 3/2010, pages 286-300.
[18]
B. Gordic, " A Contribution to the Determination of Criteria and Measures For Evaluating Operational Planning and Production Control", Technical Gazette, Vol. 18/2011, pages 109-115.
ADDRESS
Science Publishing Group
1 Rockefeller Plaza,
10th and 11th Floors,
New York, NY 10020
U.S.A.
Tel: (001)347-983-5186