1:1 Test Study on Cutting and Irrigating Process by Pre-linling Equipment
Science Discovery
Volume 4, Issue 6, December 2016, Pages: 444-449
Received: Dec. 9, 2016; Published: Dec. 9, 2016
Views 1167      Downloads 44
Authors
Wang Xiuying, School of Civil Engineering, Beijing JiaoTong University, Beijing, China
Yang Jikai, Beijing Shouer Engineering Technology Co.ltd, Beijing, China
Wu Xiaowei, Beijing Shouer Engineering Technology Co.ltd, Beijing, China
Article Tools
Follow on us
Abstract
With the higher requirements for the safety, quality, environmental protection of construction and the increasingly growing labor costs, it is imperative to promote the mechanization of the tunnel construction. Pre-lining technology as a mechanized tunnel construction method between the shallow-buried tunneling method and the shield tunneling method, can not only rapid excavatemechanized, but also effectively control the ground subsidence. In this paper, the pre-lining technology was used to simulate the tunnelconstructionin weak surrounding rock, andground deformationwas also monitored. It was showedthat the vertical and horizontal displacements of the strata were small, alsowas the and the groove deformation, which can meet the requirements for tunnel construction. And pre-lining construction methodwas more advanced compared with the traditional mechanical pre-cutting method.
Keywords
Tunnel Construction, Pre-lining, Ground Deformation
To cite this article
Wang Xiuying, Yang Jikai, Wu Xiaowei, 1:1 Test Study on Cutting and Irrigating Process by Pre-linling Equipment, Science Discovery. Vol. 4, No. 6, 2016, pp. 444-449. doi: 10.11648/j.sd.20160406.26
ADDRESS
Science Publishing Group
1 Rockefeller Plaza,
10th and 11th Floors,
New York, NY 10020
U.S.A.
Tel: (001)347-983-5186