Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application

Received: 9 December 2016    Accepted:     Published: 12 December 2016
Views:       Downloads:
Abstract

The role of pipe roof method and its development were introduced in this paper, also, the problems of its construction technology were analyzed according to its application. It was found that because of construction equipment and construction technology, there are still some defects inthe existing technology such asmore difficult construction, highercost, larger disturbance, longer construction period,and scarcely anyproject case about the pipe roof with the lock catchin China. Based on the field practice and the foreign experience, the small caliber pipe roof with the lock catch technology was researched and its construction principle, process, characteristics, the applicationtaking the southward line of Beijing subway line 8 under cross the subway line 10 projectin China were also recommend in this paper, it was showed that the supporting intensity of the small caliber pipe roof method with the lock catch can meet the settlement requirements of undercrossing important structure building, and the smaller ground disturbance, lower costpromise a broad application prospect.

Published in Science Discovery (Volume 4, Issue 6)
DOI 10.11648/j.sd.20160406.28
Page(s) 456-461
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Pipe Roof, Lock Catch, Underground Space, Small Caliber, Ground Disturbance

References
[1] 陈晓轩.“蜂窝拱”隧道工法概述[J].青海交通科技,2010,1:36-40。
[2] 沈桂平,曹文虹,杨俊龙,朱合华.管幕法综述[J].岩土工程界,2005,9(2):7-29。
[3] 陈鸿.管幕工法在北虹路地道中的应用[J].地下工程与隧道,2007,1:16-17。
[4] 李兴高,袁大军.超长管幕在浅埋暗挖隧道下穿机场跑道施工中的应用[J].铁道建筑,2014,2:67-69。
[5] 岑冈.封闭管幕保护下的箱涵顶进设计[J].科技创新导报,2009,3:76-78。
[6] 张月东.横穿机场跑道捷运通道施工沉降控制研究[NH].2012:17-22。
[7] 李刚.泥水平衡顶管机在拱北隧道曲线管幕工程中的应用[J].铁道标准设计,2015,4(59):98-100。
[8] 张军,胡向东,任辉.拱北隧道管幕冻结施工中限位管的冻结效果控制研究[J].隧道建设,2015,35(11):1157-1158。
[9] 黎轩,王啟铜,王道伟,谢红明,张鹏.高水压复杂地质条件下管幕顶管接收技术优选[J].地质科技情报,2016(2):P63-66。
[10] 李志宏,李剑.曲线顶管管幕管间相互影响研究[J].现代隧道技术,2015,52(3):P63-68。
[11] 袁金荣,陈鸿.利用小口径顶管机建造大断面地下空间的一种新手段-管幕工法[J].地下工程与隧道,2004,(1):23-26。
[12] 邢凯,陈涛,黄常波.新管幕工法概述[J].城市轨道交通研究,2009,(8):63-67。
[13] 房营光,莫海鸿,张传英.顶管施工扰动区土体变形理论与实测分析[J].岩石力学与工程学报,2003,22(4):601-605。
[14] 魏纲,徐日庆,屠玮.顶管施工引起的土体扰动理论分析及试验研究[J].岩石力学与工程学报,2004,23(3):476-482
Cite This Article
  • APA Style

    Yang Jikai, Wu Xiaowei. (2016). Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application. Science Discovery, 4(6), 456-461. https://doi.org/10.11648/j.sd.20160406.28

    Copy | Download

    ACS Style

    Yang Jikai; Wu Xiaowei. Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application. Sci. Discov. 2016, 4(6), 456-461. doi: 10.11648/j.sd.20160406.28

    Copy | Download

    AMA Style

    Yang Jikai, Wu Xiaowei. Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application. Sci Discov. 2016;4(6):456-461. doi: 10.11648/j.sd.20160406.28

    Copy | Download

  • @article{10.11648/j.sd.20160406.28,
      author = {Yang Jikai and Wu Xiaowei},
      title = {Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application},
      journal = {Science Discovery},
      volume = {4},
      number = {6},
      pages = {456-461},
      doi = {10.11648/j.sd.20160406.28},
      url = {https://doi.org/10.11648/j.sd.20160406.28},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.sd.20160406.28},
      abstract = {The role of pipe roof method and its development were introduced in this paper, also, the problems of its construction technology were analyzed according to its application. It was found that because of construction equipment and construction technology, there are still some defects inthe existing technology such asmore difficult construction, highercost, larger disturbance, longer construction period,and scarcely anyproject case about the pipe roof with the lock catchin China. Based on the field practice and the foreign experience, the small caliber pipe roof with the lock catch technology was researched and its construction principle, process, characteristics, the applicationtaking the southward line of Beijing subway line 8 under cross the subway line 10 projectin China were also recommend in this paper, it was showed that the supporting intensity of the small caliber pipe roof method with the lock catch can meet the settlement requirements of undercrossing important structure building, and the smaller ground disturbance, lower costpromise a broad application prospect.},
     year = {2016}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Brief Discussion on the Small Caliber Pipe Roof Method with the Lock Catch and Its Application
    AU  - Yang Jikai
    AU  - Wu Xiaowei
    Y1  - 2016/12/12
    PY  - 2016
    N1  - https://doi.org/10.11648/j.sd.20160406.28
    DO  - 10.11648/j.sd.20160406.28
    T2  - Science Discovery
    JF  - Science Discovery
    JO  - Science Discovery
    SP  - 456
    EP  - 461
    PB  - Science Publishing Group
    SN  - 2331-0650
    UR  - https://doi.org/10.11648/j.sd.20160406.28
    AB  - The role of pipe roof method and its development were introduced in this paper, also, the problems of its construction technology were analyzed according to its application. It was found that because of construction equipment and construction technology, there are still some defects inthe existing technology such asmore difficult construction, highercost, larger disturbance, longer construction period,and scarcely anyproject case about the pipe roof with the lock catchin China. Based on the field practice and the foreign experience, the small caliber pipe roof with the lock catch technology was researched and its construction principle, process, characteristics, the applicationtaking the southward line of Beijing subway line 8 under cross the subway line 10 projectin China were also recommend in this paper, it was showed that the supporting intensity of the small caliber pipe roof method with the lock catch can meet the settlement requirements of undercrossing important structure building, and the smaller ground disturbance, lower costpromise a broad application prospect.
    VL  - 4
    IS  - 6
    ER  - 

    Copy | Download

Author Information
  • Beijingshouer Engineering Technology Co., ltd, Beijing, China

  • Beijingshouer Engineering Technology Co., ltd, Beijing, China

  • Sections