Mining method was mainly used for the tunnel construction in many areas of our country, which requires more human resources relatively. With the labor force Increasingly,the application of mining method was relatively limited. Pre-lining technology was used to build the pre-lining arch shell in the tunnel arch before the tunnel was excavated. With the protection of the pre-lining arch shell, the whole section or step excavation method were prior choice to realize the mechanized excavation, further to improve the construction efficiency and to save the labor costs. It was showed that the pre-lining equipment has good match with the pre-lining construction method and can meet the requirements of the pre-lining technical.

DOI 10.11648/j.sd.20160406.24
Published in Science Discovery (Volume 4, Issue 6, December 2016)
Page(s) 431-435
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Tunnel, Pre-lining, Mining Method

References
[1] 唐经世.隧道预切槽施工法与机械[J].筑路机械与施工机械化,2001(1):P37-38。
[2] BCazenave,YLeGoer.MechanicalPrecutting[J].NorthAmericanTunneling,1996:P71-79。
[3] 王秀英.机械预切槽法开挖软土隧道地层变形研究[J].岩土力学,2005,26(1):P140-144。
[4] 王全贤.大直径盾构隧道在北京地铁工程中的应用[J]都市快轨交通,2012,25(5):P99-104。
[5] 李孔明.预切槽工法修建隧道的模型试验及结构设计研究[D].北京,北京交通大学,2011: P1-P103。
[6] 郝烨江,贺美德,赵坤、王秀英.机械预切槽法施工机械结构详析与模型[J].中北大学学报(自然科学版).2013,34(1):p86-p92。
[7] 王秀英,刘维宁,赵伯明,等.预切槽技术及其应用中的关键技术问题[J].现代隧道技术,2011,48(3):P22-27。
[8] 张鍼.减轻隧道施工爆破对地面振动影响的掘进方法[J].中国地质灾害与防治学报,1996(3):P52-58。
[9] 王秀英,张鍼,吕和林,周明亮.机械预切槽法开挖软土隧道地层变形研究[J].岩土力学,2005(1):P140-144。
[10] 翁伯康,王慨慷,张成满.隧道预切槽机及其施工方案探讨[J]铁道建筑技术.1996,4:P10-P13。
[11] 张召.预切槽法开挖黄土隧道地层变形规律及掌子面稳定性研究[D].北京,北京交通大学,2014:P1-88。
[12] 韩任贤.软弱围岩隧道锁脚锚杆受力及预衬砌结构承载能力研究[D].北京,北京交通大学,2015:P1-108。
Author Information
  • Beijingshouer Engineering Technology Co., ltd, Beijing, China

  • Beijingshouer Engineering Technology Co., ltd, Beijing, China

Cite This Article
  • APA Style

    Yang Jikai, Wu Xiaowei. (2016). Preliminary Study on Tunnel Pre-lining Method and Machine. Science Discovery, 4(6), 431-435. https://doi.org/10.11648/j.sd.20160406.24

    Copy | Download

    ACS Style

    Yang Jikai; Wu Xiaowei. Preliminary Study on Tunnel Pre-lining Method and Machine. Sci. Discov. 2016, 4(6), 431-435. doi: 10.11648/j.sd.20160406.24

    Copy | Download

    AMA Style

    Yang Jikai, Wu Xiaowei. Preliminary Study on Tunnel Pre-lining Method and Machine. Sci Discov. 2016;4(6):431-435. doi: 10.11648/j.sd.20160406.24

    Copy | Download

  • @article{10.11648/j.sd.20160406.24,
      author = {Yang Jikai and Wu Xiaowei},
      title = {Preliminary Study on Tunnel Pre-lining Method and Machine},
      journal = {Science Discovery},
      volume = {4},
      number = {6},
      pages = {431-435},
      doi = {10.11648/j.sd.20160406.24},
      url = {https://doi.org/10.11648/j.sd.20160406.24},
      eprint = {https://download.sciencepg.com/pdf/10.11648.j.sd.20160406.24},
      abstract = {Mining method was mainly used for the tunnel construction in many areas of our country, which requires more human resources relatively. With the labor force Increasingly,the application of mining method was relatively limited. Pre-lining technology was used to build the pre-lining arch shell in the tunnel arch before the tunnel was excavated. With the protection of the pre-lining arch shell, the whole section or step excavation method were prior choice to realize the mechanized excavation, further to improve the construction efficiency and to save the labor costs. It was showed that  the pre-lining equipment has good match with the pre-lining construction method and can meet the requirements of the pre-lining technical.},
     year = {2016}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Preliminary Study on Tunnel Pre-lining Method and Machine
    AU  - Yang Jikai
    AU  - Wu Xiaowei
    Y1  - 2016/12/09
    PY  - 2016
    N1  - https://doi.org/10.11648/j.sd.20160406.24
    DO  - 10.11648/j.sd.20160406.24
    T2  - Science Discovery
    JF  - Science Discovery
    JO  - Science Discovery
    SP  - 431
    EP  - 435
    PB  - Science Publishing Group
    SN  - 2331-0650
    UR  - https://doi.org/10.11648/j.sd.20160406.24
    AB  - Mining method was mainly used for the tunnel construction in many areas of our country, which requires more human resources relatively. With the labor force Increasingly,the application of mining method was relatively limited. Pre-lining technology was used to build the pre-lining arch shell in the tunnel arch before the tunnel was excavated. With the protection of the pre-lining arch shell, the whole section or step excavation method were prior choice to realize the mechanized excavation, further to improve the construction efficiency and to save the labor costs. It was showed that  the pre-lining equipment has good match with the pre-lining construction method and can meet the requirements of the pre-lining technical.
    VL  - 4
    IS  - 6
    ER  - 

    Copy | Download

  • Sections