European Business & Management

| Peer-Reviewed |

Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine

Received: 12 October 2019    Accepted: 08 November 2019    Published: 04 December 2019
Views:       Downloads:

Share This Article

Abstract

This research work is about the maintenance performances analysis and improvement of miscellaneous mining machinery and equipment used at the NORDGOLD SOMITA mining plant. The study started with a brief introduction to the mining activity. Then a general presentation of the TAPARKO mining site and its history was performed. Moreover, an overview of the equipment which is used on the mining site and its mechanical applications and utility was carried out. The maintenance plays a vital and essential role in the mining sector. A good maintenance management provides the plant with safe and effective equipment. One of the main issues in maintenance planning is to make sure that the planned maintenance tasks have positively influenced the productivity of the plant as expected. In order to achieve the desired performance at an optimal cost, the maintenance department has to keep monitoring the maintenance performances. This will help the company to reach the maximum profitability. Some maintenance key performance indicators exist and they allow the maintenance planners to monitor the maintenance effectiveness in a defined interval of time. Thus, a decrease of maintenance performances can be quickly detected and prompt corrective measures can be taken. Therefore, the necessary data was collected and an analysis of those indicators was accomplished. The obtained results revealed that. Last but not least, through a thorough examination of these results, some suggestions have been made in order to improve the mechanical maintenance practices in the mining sector.

DOI 10.11648/j.ebm.20190506.13
Published in European Business & Management (Volume 5, Issue 6, November 2019)
Page(s) 84-92
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Mining, Machinery, Maintenance, Key Performance Indicators, Performance Measurement

References
[1] Introduction to mining, page 1-24, www.cienciaviva.pt.upload.pdf, [Date of visit: 10/09/2019].
[2] Cross-Najafi, I. N. Gold Formation, Extraction, and Refining in the Sierra Nevada Mountain.
[3] Liliane, M. et al [2009] Empirical Analysis of Maintenance Performance Measurement in Belgian Industries, International Journal of production, pp: 1-12.
[4] Oliveira, M. et al [2016] Use of Maintenance Performance Indicators by Companies of the Industrial Hub of Manaus, Changeable, Agile, Reconfigurable & Virtual Production Conference.
[5] Shrivastava, A. K., &. Sharma, A. K. [2012] A Review Study of Jaw Crushers, IJMER, pp-885-888.
[6] Hulthen, E. [2010] Real-Time Optimization of Cone Crushers, Chalmers University of Technology, PhD thesis, 2010.
[7] JAGADEESH P. et al [2018] Fabrication of Low-Cost Ball Milling Machine, EPH International Journal of Science and Engineering, Vol 1 No 1.
[8] Balasubramanian, A. [2017] Size Reduction by Grinding Methods, University of Mysore.
[9] Gold extraction – Gold Mining – [2008] Washing, Amalgamation, Leaching, Smelting, www.geology.com, [Date of visit: 15/09/2019].
[10] Schubert, J. H. et al [1993] Performance evaluation of carbon in pulp plant, J. S. Afr. Inst. Min Metall., Vol. 93, no. 11/12, pp. 293-299.
[11] Kelly, A. Maintenance Strategy: Business Centered Maintenance. Oxford, Reed Educational and Professional Publishing.
[12] Dekker, R. [1996] Application of Maintenance Optimization Models: A Review and Analysis. Reliability Engineering & System Safety, 51 (3): 229-240.
[13] Reason, J. T. and Hobbs, A. [2003] Managing Maintenance Error: A practical Guide, Ashgate Publishing.
[14] Campbell, J. D. Uptime: Strategies for excellence in Maintenance Management. Portland, OR, Productivity Press.
[15] Erkoyuncu, J. A. et al. Improving Efficiency of Industrial Maintenance with Context Aware Adaptive Authoring in Augmented Reality, CIRP Annals, V. 66, pp 465-468.
[16] FIIX, What Is Maintenance Backlog? www.fixsoftware.com/maintenance-backlog [Date of visit: 18/09/2019].
[17] SYMA Consulting, Sylvie, Rework vs Repair, www.symaconsulting.com/blog/rework-vs-repair/ [Date of visit: 18/09/2019].
[18] Torell, W. &. Avelar, [2004] V. Mean Time Between Failure: Explanation and Standards, Schneider Electric.
[19] Serge et al, M. [2016] Motion Systems: An overview of Linear, Air Bearing and Piezo Stages, Adhesives Technology for Electronic Applications.
[20] Fortshoffer, M. S. [2017] Reliability Optimization, Fortshoffer’s More Best Practices for Rotating Equipment.
Author Information
  • Mechanical Engineering Department, Faculty of Engineering, Istanbul University, Istanbul, Turkey

  • Gold Mine Plant, Nordgold Somita, Taparko, Burkina Faso

  • Mechanical Engineering Department, Institute of Technology, Nazi Boni University, Bobo-Dioulasso, Burkina Faso

  • Gold Mine Plant, Nordgold Somita, Taparko, Burkina Faso

Cite This Article
  • APA Style

    Drissa Mohamed Malo, Arsene Kpoda, Hamidou Kabre, Gaetan Ouermi. (2019). Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine. European Business & Management, 5(6), 84-92. https://doi.org/10.11648/j.ebm.20190506.13

    Copy | Download

    ACS Style

    Drissa Mohamed Malo; Arsene Kpoda; Hamidou Kabre; Gaetan Ouermi. Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine. Eur. Bus. Manag. 2019, 5(6), 84-92. doi: 10.11648/j.ebm.20190506.13

    Copy | Download

    AMA Style

    Drissa Mohamed Malo, Arsene Kpoda, Hamidou Kabre, Gaetan Ouermi. Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine. Eur Bus Manag. 2019;5(6):84-92. doi: 10.11648/j.ebm.20190506.13

    Copy | Download

  • @article{10.11648/j.ebm.20190506.13,
      author = {Drissa Mohamed Malo and Arsene Kpoda and Hamidou Kabre and Gaetan Ouermi},
      title = {Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine},
      journal = {European Business & Management},
      volume = {5},
      number = {6},
      pages = {84-92},
      doi = {10.11648/j.ebm.20190506.13},
      url = {https://doi.org/10.11648/j.ebm.20190506.13},
      eprint = {https://download.sciencepg.com/pdf/10.11648.j.ebm.20190506.13},
      abstract = {This research work is about the maintenance performances analysis and improvement of miscellaneous mining machinery and equipment used at the NORDGOLD SOMITA mining plant. The study started with a brief introduction to the mining activity. Then a general presentation of the TAPARKO mining site and its history was performed. Moreover, an overview of the equipment which is used on the mining site and its mechanical applications and utility was carried out. The maintenance plays a vital and essential role in the mining sector. A good maintenance management provides the plant with safe and effective equipment. One of the main issues in maintenance planning is to make sure that the planned maintenance tasks have positively influenced the productivity of the plant as expected. In order to achieve the desired performance at an optimal cost, the maintenance department has to keep monitoring the maintenance performances. This will help the company to reach the maximum profitability. Some maintenance key performance indicators exist and they allow the maintenance planners to monitor the maintenance effectiveness in a defined interval of time. Thus, a decrease of maintenance performances can be quickly detected and prompt corrective measures can be taken. Therefore, the necessary data was collected and an analysis of those indicators was accomplished. The obtained results revealed that. Last but not least, through a thorough examination of these results, some suggestions have been made in order to improve the mechanical maintenance practices in the mining sector.},
     year = {2019}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Mining Machinery Maintenance Key Performance Indicators Improvement at the Nordgold Taparko Mine
    AU  - Drissa Mohamed Malo
    AU  - Arsene Kpoda
    AU  - Hamidou Kabre
    AU  - Gaetan Ouermi
    Y1  - 2019/12/04
    PY  - 2019
    N1  - https://doi.org/10.11648/j.ebm.20190506.13
    DO  - 10.11648/j.ebm.20190506.13
    T2  - European Business & Management
    JF  - European Business & Management
    JO  - European Business & Management
    SP  - 84
    EP  - 92
    PB  - Science Publishing Group
    SN  - 2575-5811
    UR  - https://doi.org/10.11648/j.ebm.20190506.13
    AB  - This research work is about the maintenance performances analysis and improvement of miscellaneous mining machinery and equipment used at the NORDGOLD SOMITA mining plant. The study started with a brief introduction to the mining activity. Then a general presentation of the TAPARKO mining site and its history was performed. Moreover, an overview of the equipment which is used on the mining site and its mechanical applications and utility was carried out. The maintenance plays a vital and essential role in the mining sector. A good maintenance management provides the plant with safe and effective equipment. One of the main issues in maintenance planning is to make sure that the planned maintenance tasks have positively influenced the productivity of the plant as expected. In order to achieve the desired performance at an optimal cost, the maintenance department has to keep monitoring the maintenance performances. This will help the company to reach the maximum profitability. Some maintenance key performance indicators exist and they allow the maintenance planners to monitor the maintenance effectiveness in a defined interval of time. Thus, a decrease of maintenance performances can be quickly detected and prompt corrective measures can be taken. Therefore, the necessary data was collected and an analysis of those indicators was accomplished. The obtained results revealed that. Last but not least, through a thorough examination of these results, some suggestions have been made in order to improve the mechanical maintenance practices in the mining sector.
    VL  - 5
    IS  - 6
    ER  - 

    Copy | Download

  • Sections