The asphalt concrete core wall has been widely used in various kinds of high dams because of its good performance of anti-seepage, deformation and rapid construction speed. In recent years, the leakage phenomena of some asphalt concrete core dams begin to occur, endangering dam safety. To determine the leakage status, location and access of the bituminous concrete core, drilling holes are arranged in the upper and lower reaches of the bituminous concrete core wall. With water as the medium, underwater sonar, color TV observation in hole, consecutive test of tracer, water level analysis in the dam body and physical detection and other methods were used for detection. Then the leakage state of asphalt concrete core wall of dam body is comprehensively analyzed and determined according to a variety of test results. At the same time, aiming at the problems existing in the direct repair of asphalt concrete core wall in the dam body, repairing project of concrete seepage cut-off wall, controlling grouting repair scheme, as well as its key control factors, construction process and technical parameter indexes were studied. Through the application of multiple engineering examples, the treatment effect was remarkable, which can provide a reference for the treatment of similar engineering problem.

Published in American Journal of Water Science and Engineering (Volume 4, Issue 4)
DOI 10.11648/j.ajwse.20180404.13
Page(s) 101-106
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Earth-Rockfill Dam with Asphalt Concrete Core, Seepage Detection, Anti-Seepage System, Repair

References
[1] ZHOU Xinhua, RAO Xibao, ZHU Guosheng. Proceedings of the second national conference on geotechnical and geotechnical engineering [C]. Beijing: science press, 2006.
[2] SL 501-2010 Design code of asphalt concrete facings and cores for embankment dams [S]. Beijing: China Water & Power Press, 2010.
[3] WANG Weibiao, SHEN Jihong. Brief introduction of asphalt concrete core wall of China earth dam [J]. Petroleum asphalt, 2002.
[4] MA Xinping. Design of anti-seepage treatment for bituminous concrete core dam of majiagou reservoir [J]. Dam & Safety, 2010.
[5] WEI Min, ZHOU Heqing, ZHANG Ying. Anti-Seepage Treatment of Asphalt Concrete Core Dam of Dazhu River Reservoir [J]. Yangtze River. 2016.4.
[6] DL/T 5199-2004. Technical specification for construction of concrete cut-off wall for water and hydropower projects [S]. Beijing: China Electric Power Press, 2005.
[7] SL174-2014. Technical specification for construction of concrete cut-off wall for water and hydropower projects [S]. Beijing: China Water & Power Press, 2014.
[8] DL/T 5267-2012. Specification of overburden grouting for hydropower and water resources projects [S]. Beijing: China Electric Power Press. 2012.
[9] SUN Zhao. Dam bedrock grouting [M]. Beijing: China Water & Power Press, 2004.
[10] SL 274-2001. Design specification for roller compacted earth and stone dam. Beijing: China Water & Power Press, 2002.
Cite This Article
  • APA Style

    Wei Min, Zhou Heqing, Cui Dongdong. (2018). Research and Application on Seepage Detection and Repair of Anti-Seepage System for Earth-Rockfill Dam with Asphalt Concrete Core. American Journal of Water Science and Engineering, 4(4), 101-106. https://doi.org/10.11648/j.ajwse.20180404.13

    Copy | Download

    ACS Style

    Wei Min; Zhou Heqing; Cui Dongdong. Research and Application on Seepage Detection and Repair of Anti-Seepage System for Earth-Rockfill Dam with Asphalt Concrete Core. Am. J. Water Sci. Eng. 2018, 4(4), 101-106. doi: 10.11648/j.ajwse.20180404.13

    Copy | Download

    AMA Style

    Wei Min, Zhou Heqing, Cui Dongdong. Research and Application on Seepage Detection and Repair of Anti-Seepage System for Earth-Rockfill Dam with Asphalt Concrete Core. Am J Water Sci Eng. 2018;4(4):101-106. doi: 10.11648/j.ajwse.20180404.13

    Copy | Download

  • @article{10.11648/j.ajwse.20180404.13,
      author = {Wei Min and Zhou Heqing and Cui Dongdong},
      title = {Research and Application on Seepage Detection and Repair of Anti-Seepage System for Earth-Rockfill Dam with Asphalt Concrete Core},
      journal = {American Journal of Water Science and Engineering},
      volume = {4},
      number = {4},
      pages = {101-106},
      doi = {10.11648/j.ajwse.20180404.13},
      url = {https://doi.org/10.11648/j.ajwse.20180404.13},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajwse.20180404.13},
      abstract = {The asphalt concrete core wall has been widely used in various kinds of high dams because of its good performance of anti-seepage, deformation and rapid construction speed. In recent years, the leakage phenomena of some asphalt concrete core dams begin to occur, endangering dam safety. To determine the leakage status, location and access of the bituminous concrete core, drilling holes are arranged in the upper and lower reaches of the bituminous concrete core wall. With water as the medium, underwater sonar, color TV observation in hole, consecutive test of tracer, water level analysis in the dam body and physical detection and other methods were used for detection. Then the leakage state of asphalt concrete core wall of dam body is comprehensively analyzed and determined according to a variety of test results. At the same time, aiming at the problems existing in the direct repair of asphalt concrete core wall in the dam body, repairing project of concrete seepage cut-off wall, controlling grouting repair scheme, as well as its key control factors, construction process and technical parameter indexes were studied. Through the application of multiple engineering examples, the treatment effect was remarkable, which can provide a reference for the treatment of similar engineering problem.},
     year = {2018}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Research and Application on Seepage Detection and Repair of Anti-Seepage System for Earth-Rockfill Dam with Asphalt Concrete Core
    AU  - Wei Min
    AU  - Zhou Heqing
    AU  - Cui Dongdong
    Y1  - 2018/11/29
    PY  - 2018
    N1  - https://doi.org/10.11648/j.ajwse.20180404.13
    DO  - 10.11648/j.ajwse.20180404.13
    T2  - American Journal of Water Science and Engineering
    JF  - American Journal of Water Science and Engineering
    JO  - American Journal of Water Science and Engineering
    SP  - 101
    EP  - 106
    PB  - Science Publishing Group
    SN  - 2575-1875
    UR  - https://doi.org/10.11648/j.ajwse.20180404.13
    AB  - The asphalt concrete core wall has been widely used in various kinds of high dams because of its good performance of anti-seepage, deformation and rapid construction speed. In recent years, the leakage phenomena of some asphalt concrete core dams begin to occur, endangering dam safety. To determine the leakage status, location and access of the bituminous concrete core, drilling holes are arranged in the upper and lower reaches of the bituminous concrete core wall. With water as the medium, underwater sonar, color TV observation in hole, consecutive test of tracer, water level analysis in the dam body and physical detection and other methods were used for detection. Then the leakage state of asphalt concrete core wall of dam body is comprehensively analyzed and determined according to a variety of test results. At the same time, aiming at the problems existing in the direct repair of asphalt concrete core wall in the dam body, repairing project of concrete seepage cut-off wall, controlling grouting repair scheme, as well as its key control factors, construction process and technical parameter indexes were studied. Through the application of multiple engineering examples, the treatment effect was remarkable, which can provide a reference for the treatment of similar engineering problem.
    VL  - 4
    IS  - 4
    ER  - 

    Copy | Download

Author Information
  • Changjiang Institute of Survey, Planning, Design and Research, Wuhan, China

  • Changjiang Institute of Survey, Planning, Design and Research, Wuhan, China

  • Changjiang Institute of Survey, Planning, Design and Research, Wuhan, China

  • Sections