| Peer-Reviewed

Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania

Received: 24 July 2021    Accepted: 20 August 2021    Published: 31 August 2021
Views:       Downloads:
Abstract

The construction business in Tanzania has been acknowledged to face an increased competition resulting from globalization. Correspondingly, the construction business has occupied incredibly & everlasting challenges flabbergasted with time & cost overrun, insignificant quality, poor safety, and ecological unsustainability leading to inadequate general performance. The challenges have compelled most construction firms to become innovative to redesign the business and adopt the change approaches. The innovation approach has established and engaged the extra efforts and a persistent follow-up to attain the practicable and worthwhile resolution. Business Process Reengineering (BPR) has been touted as a propitious strategic management practice and a management change approach for attracting, elevating the competences & efficiencies, bringing great solutions and gaining a competitive advantage for construction business dramatic improvement. An exhaustive literature review, an in-depth interview, and a descriptive quantitative research tactic were assumed for this study to gather an opinion from 202 experienced experts that helped to attain the findings. SPSS-AMOS software was applied during data analysis to obtain the descriptive, inferential statistics and a structural model as findings to support the study conclusion. However, the identified BPR factors could help provide alternative thinking of influencing undertaking BPR on the construction industry to improve construction business performance in Tanzania.

Published in Industrial Engineering (Volume 5, Issue 2)
DOI 10.11648/j.ie.20210502.12
Page(s) 34-45
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Construction Industry, Construction Management, Reengineering, Performance

References
[1] URT, "The Performance Audit Report on Road works," Ministry of Finance, United Republic of Tanzania, Dar es Salaam, 2010.
[2] Simon. J., "THE FACTORS CAUSING DELAYS IN ROAD CONSTRUCTION PROJECTS IN TANZANIA: A CASE OF TANROAD DAR ES SALAAM CITY; A DISSWERTATION FOR MASTER IN PROJECT MANAGEMENT OF OPEN UNIVERSITY OF TANZANIA," Dar es Salaam, 2017.
[3] Mlinga, "Ethics in Public Procurement: A missing link in the Education and training of the construction practicioners," 2006. [Online]. Available: http://www.ncc.or.tz/epp.pdf abgerufen. [Accessed 7 May 2020].
[4] Kisunge, J., "THE CHALLENGES FACING THE LOCAL CIVIL ENGINEERING CONSULTING FIRMS IN TANZANIA," Construction Business, vol. 13, no. 1/2, pp. 1-57, 2020.
[5] Clyde&Co, "Briefing: Structure of the Construction Industry in Tanzania," Clyde & Co, Dar es salaam, 2013.
[6] Cheng, M. and Tsai, M., "Reengineering of Construction Management Process," JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, pp. 105-114, 2003.
[7] NCC, "Construction Industry Policy," 2nd March 2020. [Online]. Available: http://www.ncc.or.tz/CI_P.pdf abgerufen/Ministry of Works.
[8] Lopes, J. et al., "The long-run relationship between the construction sector and the national economy in Cape Verde," International Journal of Strategic Property Management, vol. 15, no. 1, pp. 48-59, 2011.
[9] Anugwo, IC. et al., "Potentiality of the South African Construction SMME Contractors Globalising within and Beyond the SADC Construction Markets," Journal of Construction Business and Management, vol. 2, no. 1, pp. 41-49, 2018.
[10] Tunji-Olayeni. P. et al., "COMPETITIVE STRATEGIES OF INDIGENOUS CONSTRUCTION FIRMS," International Journal of Civil Engineering and Technology (IJCIET), vol. 8, no. 10, p. 350–362, 2017.
[11] Sitsabo. D, "Relationship of Construction Sector to Economic Growth," School of Construction Management and Engineering, University of Reading, UK, 2012. [Online]. Available: www.sitsabo.co.za/docs/misc/cib_paper2012.pdf. [Accessed 11 May 2019].
[12] Tesha, D. N. G. et al., "Growth Trend of Local Building Contractors for the Period of 2005 2015 in Dar Es Salaam, Tanzania," International Research Journal of Engineering and Technology (IRJET), vol. 4, no. 7, pp. 2082-2101, 2017.
[13] Hagstedt, K & Thideman J, "Growth Challenges For Small General Contractors In the Construction Industry: A Case Study of the Norwegian Building Company to TOMMER AS, 68 Pages. Published Master of Science Thesis," Department of Technology Management and Economics, Division of Innovation Engineering and Management, Chalmers University of Technology, Göteborg, Sweden, 2013.
[14] R. David, "Industry Tap into News: Global Construction Expected to Increase by $4.8 Trillion by 2020," 1 January 2020. [Online]. Available: https://www.industrytap.com/global-construction-expected-to-increase-by-4-8-trillion-by-2020/1483.
[15] L. a. Jorge, "The sustainability of the construction industry in Sub-saharan Africa: some new evidence from recent data," Procedia Engineering, vol. 172, pp. 657-664, 2017.
[16] NBS, "Highlights for The Third Quarter: (July-September) Gross Domestic Product 2017, Dar es Salaam, Tanzania.," United Republic of Tanzania, Dar es Salaam,, 2018b.
[17] Geraldine, K. & Cecilia, E., "Role of the construction sector and key bottlenecks to supply response in Tanzania," United Nations University (UNU-WIDER), Dar es Salaam, 2018.
[18] UNESCO, "Construction: A Vibrant Industry," 2010. [Online]. Available: www.natcomreport.com/Tanzania/pdf-new/construction.pdf. [Accessed 7 1 2020].
[19] A. S. Mawenya, " 50 Years of Construction Industry Development in Tanzania; the Contracting Subsector, Proceedings of the Annual Consultative Meeting, 50 Years of Independence: Empowering Contractors to Meet the Challenges Ahead, Mlimani City, Dar e," Dar es Salaam, 2011.
[20] Ofori, G., "Developing the Construction Industry in Ghana: the case for a central agency," National University of Singapore, Singapore, 2012.
[21] G. Sudhakar, "The Role of IT in Business Process Reengineering," 2010. [Online]. Available: https://www.researchgate.net/publication/237050536_The_Role_of_IT_in_Business_Process_Reengineering. [Accessed 30Th June 2020].
[22] E. Tsang, "Business Process Reengineering and why it requires Business event analysis," Case Trends, vol. 56, no. 3, pp. 8-15, 1993.
[23] Ulrsic, D. et al., "The steps towards successful Reengineering in Slovenian Companies, University of Maribor, Slovenia," University of Maribor, Slovenia, 2005.
[24] V. Ireland, "Process Re-engineering in Construction, T40 Report, Fletcher Constructions, Sydney, Australia, May," Sydney, 1994.
[25] Shodhgang, "Chapter -1 Introduction-Shodhgang," 2008. [Online]. Available: http://shodhganga.inflibnet.ac.in/jspui/bitstream/10603/194900/6/06_chapter%201.pdf. [Accessed 25th June 2020].
[26] Cao, G., "A Critique of BPR from a holistic perspective," Business Process Management Journal, vol. 7, no. 4, pp. 332-339, 2001.
[27] M. Pryor, "Business Process re-engineering-Strategy and organization," 2020. [Online]. Available: https://www.referenceforbusiness.com/management/Bun-Comp/Business-Process-Reengineering.html. [Accessed 1st May 2020].
[28] R. Hunt, "Case Study: SBI, Worlds Largest Centrailsed Core Processing Implementation", India, 2009.
[29] Magutu, P. et al., "Business Process Reengineering for competitive advantage: Key factors that may lead to the success or failure of the BPR implementation (The Wrigley Company)," African Journal of Business and Management (AJBUMA), 2010.
[30] T. Debela, "Business Process Reengineering in Ethiopian public Organizations: The relationship between theory and Practice," Journal of Business and Administrative Studies, vol. 1, no. 2, 2009.
[31] Mlay, S., "A Quantitative Analysis of Business Process Reengineering and Organizational Resistance: The Case of Uganda," The African Journal of Information Systems:, vol. 5, no. 1, pp. 1-27, 2013.
[32] Joshi, C. & Jangwal, P., "Management of Business Process Reengineering Projects Study," Journal of Project, Program and Portifolio Management, vol. 3, no. 1, pp. 78-89, 2012.
[33] D. Kruger, "Lean Production and Business Process Reengineering in a South African context: A Case study. A PhD Thesis, University of Johannesburg," 2008. [Online]. Available: https://ujdigispace.uj.ac.za/bitstream/handle/10210/3105/Kruger.pdf?sequence=1. [Accessed 29 June 2020].
[34] Sidwell, A. C. et al., "Reengineering the Construction Delivery Process, Report and Case Studies, Construction Industry Institute Australia," 2002. [Online]. Available: www.ciia.qut.com. [Accessed 28Th June 2020].
[35] H. Sikazwe, "Information Technology in the European Construction Industry; The Application of Workflow Management and Business Process Reengineering," Forum, Research Paper, 1999.
[36] R. Graham, Business process reengineering: strategies for occupational health and safety, Newcastle: Cambridge Scholar, 2010.
[37] Bako, Y. & Banmeke, M., "The Impact of Business Process Re-Engineering on Organizational Performance," Journal of Management and Technology, vol. 5, no. 1, pp. 1-14, 2019.
[38] Johnson, B. et al., "Reengineering: Setting a course for radical change," Journal for Business Strategy, vol. 14, no. 6, pp. 52-68, 2003.
[39] Cheng, T. and Chiu, I., "Critical success factors of business process re-engineering in the banking industry," The Journal of Corporate Transformation, 2008.
[40] Albadvi. et al., "Assessing readiness for business process reengineering," Business Process Management Journal, vol. 14, no. 4, pp. 497-511, 2008.
[41] D. Carr, "Managing for effective business process redesign," Cost Management, Fall, pp. 16-21, 1993.
[42] Hammer, M., & Champy, J., Re-engineering the Corporation, London: Nicholas Brealy, 1993.
[43] Naz, A., "Journal of Resources Development and Management," Role of Human Resources Management in the Effectiveness of Business Process Reengineering, vol. 1, pp. 60-64, 2013.
[44] Al-Mashari, M. and zairi, M., "BPR Implementation Process: An analysis of Key Success and failure Factors," International Journal of Hospitality Management, pp. 88-107, 2013.
[45] A. Akbaba, "Business Performance of Small Tourism Enterprises: A Comparison among Three Sub-Sectors of the Industry," An International Journal of Tourism and Hospitality Research, vol. 23, pp. 177-195, 2012.
[46] D. Hancott, "The Relationship between Transformational Leadership and Organisational.
[47] Performance in the Largest Public Companies in Canada. Doctoral Dissertation," Capella University, Minneapolis, 2005.
[48] Reijonen, H. and Komppula, R, "Perception of Success and Its Effect on Small Firm Performance," Journal of Small Business and Enterprise Development, vol. 14, pp. 689-701, 2007.
[49] Hove and Adewale., "Performance in the Construction Industry—A Conceptual and Theoretical Analysis," Open Journal of Business and Management, vol. 3, pp. 177-184, 2015.
[50] S. Tatjana, Industrial Research Performance Management Key Performance Indicators in the ICT Industry, Walldorf, Germany: Springer-Verlage-Berlin, Heidelberg, 2012.
[51] E. Greyling, Opportunities for Employment Creation through SME Development in the Construction Sector, Pretoria: Free State. International Labour Organisation, 2012.
[52] Taouab, O. and Issor, Z., "Firm Performance: Definition and Measurement Models," European Scientific Journal January 2019 edition Vol. 15, No. 1, vol. 15, no. 1, 2019.
[53] Samson M and Lema N, "Development of construction contractors performance measurement framework, 1st International Conference of Creating a Sustainable," Dar Es salaam, 2002.
[54] Faridi, A. and El-Sayegh, S, "Significant Factors Causing Delay in the UAE Construction Industry," Construction Management and Economics, vol. 24, pp. 1167-1176, 2006.
[55] Sitharam and Hoque, "Factors affecting the performance of small and medium enterprises," Problems and Perspectives in Management, pp. 277-288, 2016.
[56] Anna, A. et al., "Management features of small and medium-sized business Enterprises," vol. 40, no. 34, p. 6, 2019.
[57] Gamage, S. et al., "A Review of Global Challenges and Survival Strategies of Small and Medium Enterprises (SMEs)," economies, vol. 8, no. 79, p. 24, 2020.
[58] Mustafa and Yakuub, "Innovation and Technology Adoption Challenges: Impact on SMEs’ Company Performance," International Journal of Accounting, Finance and Business, vol. 3, p. 57–65, 2018.
[59] S. Ahmedova, "Factors for Increasing the Competitiveness of Small and Medium-Sizes Enterprises (SMEs) in Bulgaria," Procedia-Social and Behavioral Sciences, vol. 195, p. 1104–12, 2015.
[60] K. Taber, "The Use of Cronbach’s Alpha When Developing and Reporting Research Instruments in Science Education," Research in Science Education, 2017.
[61] Gliem, J. A. and Gliem, R. R, "Calculating, Interpreting, and Reporting Cronbach’s Alpha Reliability Coefficient for Likert-Type Scales," in Midwest Research-to-Practice Conference in Adult, Continuing, and Community Education,, Columbus, OH, 2003.
[62] Edward and Mbohwa, "The Role of Leadership in Business Process Reengineering “Leaders, do you want to change?”," Information and Knowledge Management, vol. 3, no. 2, pp. 125-131, 2013.
[63] I. Shifidi, "Small Builders In The Namibian Construction Sector: Opportunities, Challenges And Support Strategies," 2012. [Online]. Available: https://econrsa.org/system/files/workshops/papers/2012/shifidi-small-builders.pdf. [Accessed 23 4 2019].
[64] Herzog. et al., "Development and validation of business process reengineering (BPR) variables: a survey research in Slovenian Companies," International journal of production research, vol. 45, no. 34, pp. 5811-5834, 2007.
[65] M. Smith, "Business Process Redesign: Correlates of success and failure," The quality management Journal, vol. 2, pp. 38-49, 2003.
[66] Bhatti & Jayaraman, "An empirical validation of the critical success factors for the implementation of EPR systems," in European and Mediterranean conference on information systems, 25-26 May, Dubai, 2008.
[67] Prajogo, D. and McDermott, C., "The relationship between total quality management practices and organizational culture," International Journal of Operations & Production Management, vol. 25, no. 11, pp. 1101-1122, 2005.
[68] Alibabaei, A. et al., "The Role of Culture in Business Process Management Initiatives," Australian Journal of Basic and Applied Sciences, vol. 4, no. 7, pp. 2143-2154, 2010.
[69] Zucchi, F. and Edwards, J, "Human resource management aspects of business process reengineering: a survey," Business Process Management Journal, vol. 5, no. 4, pp. 325-344, 1999.
[70] Gray and Hughes, Building Design Management, Great Bretain: Butterworth Heinemann, 2001.
[71] Berrington and Oblich, "Translating reengineering into bottom-line results," Industrial Engineering, pp. 24-7, 1995.
[72] Cheng & Chiu, "Critical Success Factors of Business Process Re-engineering in the Banking Industry," Knowledge and Process Management, vol. 15, no. 4, pp. 258-269, 2008.
[73] M. Hammer, "Re-engineering work: Don't automate; obliterate," Harvard Business Review, vol. 68, no. 4, pp. 104-112, 1990.
Cite This Article
  • APA Style

    Ramadhani Said Tekka. (2021). Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania. Industrial Engineering, 5(2), 34-45. https://doi.org/10.11648/j.ie.20210502.12

    Copy | Download

    ACS Style

    Ramadhani Said Tekka. Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania. Ind. Eng. 2021, 5(2), 34-45. doi: 10.11648/j.ie.20210502.12

    Copy | Download

    AMA Style

    Ramadhani Said Tekka. Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania. Ind Eng. 2021;5(2):34-45. doi: 10.11648/j.ie.20210502.12

    Copy | Download

  • @article{10.11648/j.ie.20210502.12,
      author = {Ramadhani Said Tekka},
      title = {Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania},
      journal = {Industrial Engineering},
      volume = {5},
      number = {2},
      pages = {34-45},
      doi = {10.11648/j.ie.20210502.12},
      url = {https://doi.org/10.11648/j.ie.20210502.12},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ie.20210502.12},
      abstract = {The construction business in Tanzania has been acknowledged to face an increased competition resulting from globalization. Correspondingly, the construction business has occupied incredibly & everlasting challenges flabbergasted with time & cost overrun, insignificant quality, poor safety, and ecological unsustainability leading to inadequate general performance. The challenges have compelled most construction firms to become innovative to redesign the business and adopt the change approaches. The innovation approach has established and engaged the extra efforts and a persistent follow-up to attain the practicable and worthwhile resolution. Business Process Reengineering (BPR) has been touted as a propitious strategic management practice and a management change approach for attracting, elevating the competences & efficiencies, bringing great solutions and gaining a competitive advantage for construction business dramatic improvement. An exhaustive literature review, an in-depth interview, and a descriptive quantitative research tactic were assumed for this study to gather an opinion from 202 experienced experts that helped to attain the findings. SPSS-AMOS software was applied during data analysis to obtain the descriptive, inferential statistics and a structural model as findings to support the study conclusion. However, the identified BPR factors could help provide alternative thinking of influencing undertaking BPR on the construction industry to improve construction business performance in Tanzania.},
     year = {2021}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Influential Factors for Undertaking BPR on Construction Industry to Improve Contractors Performance in Tanzania
    AU  - Ramadhani Said Tekka
    Y1  - 2021/08/31
    PY  - 2021
    N1  - https://doi.org/10.11648/j.ie.20210502.12
    DO  - 10.11648/j.ie.20210502.12
    T2  - Industrial Engineering
    JF  - Industrial Engineering
    JO  - Industrial Engineering
    SP  - 34
    EP  - 45
    PB  - Science Publishing Group
    SN  - 2640-1118
    UR  - https://doi.org/10.11648/j.ie.20210502.12
    AB  - The construction business in Tanzania has been acknowledged to face an increased competition resulting from globalization. Correspondingly, the construction business has occupied incredibly & everlasting challenges flabbergasted with time & cost overrun, insignificant quality, poor safety, and ecological unsustainability leading to inadequate general performance. The challenges have compelled most construction firms to become innovative to redesign the business and adopt the change approaches. The innovation approach has established and engaged the extra efforts and a persistent follow-up to attain the practicable and worthwhile resolution. Business Process Reengineering (BPR) has been touted as a propitious strategic management practice and a management change approach for attracting, elevating the competences & efficiencies, bringing great solutions and gaining a competitive advantage for construction business dramatic improvement. An exhaustive literature review, an in-depth interview, and a descriptive quantitative research tactic were assumed for this study to gather an opinion from 202 experienced experts that helped to attain the findings. SPSS-AMOS software was applied during data analysis to obtain the descriptive, inferential statistics and a structural model as findings to support the study conclusion. However, the identified BPR factors could help provide alternative thinking of influencing undertaking BPR on the construction industry to improve construction business performance in Tanzania.
    VL  - 5
    IS  - 2
    ER  - 

    Copy | Download

Author Information
  • College of Architecture and Construction Technology, Department of Construction Management and Technology, Mbeya University of Science and Technology, Mbeya, Tanzania

  • Sections