Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia

Received: 12 June 2019    Accepted: 10 July 2019    Published: 23 July 2019
Views:       Downloads:
Abstract

The private sector has long been involved in delivering public sector projects in Ethiopia but its role limited as consultant and contractor for the government. Over recent years, the interest in adopting Public Private Partnership (PPP) has increased internationally. Many research outcomes have presented positive reasons for the governments and the private sector to welcome this form of long term contract arrangement, rather than continue involving in the traditional procurement methods. This paper aims to explore the attractive factors for PPP implementation in the Ethiopian road sector. A questionnaire survey was conducted in Ethiopia and survey respondents were invited to rate their perceptions on the importance of seventeen different attractive factors identified. The results show that the five important attractive factors for pursuing PPP in the Ethiopian road sector are: ‘solve the problem of public sector budget restraint’, ‘facilitate creative and innovative approaches’, ‘save time in delivering the project’, ‘improve maintainability’ and ‘enhance government integrated solution capacity’. The research outputs contribute to the limited knowledge on PPP practices in Ethiopia by providing empirical evidence on the conditions that are attractive to the introduction of PPP in the road sector.

Published in Journal of Civil, Construction and Environmental Engineering (Volume 4, Issue 3)
DOI 10.11648/j.jccee.20190403.11
Page(s) 59-68
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Ethiopia, Procurement, Public Sector, Private Sector, Partnerships, Road Infrastructure, Attractive Factors

References
[1] Bhattacherjee, A. (2012). Social Science Research: Principles, Methods, and Practices. Second Edition Copyright © 2012 by Anol Bhattacherjee.
[2] Chan, A. P., Lam, P. T., Chan, D. W., Cheung, E., & Ke, Y. (2009). Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT © ASCE / 1115, 1115-1124.
[3] Cheung, E., Chan, A. P., Lam, P. T., Chan, D. W., & Ke, Y. (2012). A Comparative Study of Critical Success Factors for Public Private Partnerships (PPP) between Mainland China and the Hong Kong Special Administrative Region. Facilities - Special Issue on Facility Management Development (Final Accepted Manuscript), Volume 30, Issue 13/14, 647-666.
[4] Cheung, E., Chan, A. P., & Kajewski, S. (2009). Reasons for implementing public private partnership projects: Perspectives from Hong Kong, Australian and British practitioners. Journal of Property Investment & Finance Vol. 27 Issue: 1, 81-95.
[5] Fellows, R., & Liu, A. (2008). Research Methods for Construction Third Edition. John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8 SQ, Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8 SQ, Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8 SQ, UK.
[6] Foster, V., & Morella, E. (2010). Ethiopia’s Infrastructure: A Continental Perspective. Washington, DC: 2010 The International Bank for Reconstruction and Development / The World Bank.
[7] Joha, A., & Janssen, M. (2010). Public-private partnerships, outsourcing or shared service centres?: Motives and intents for selecting sourcing configurations. Transforming Government: People, Process and Policy, Vol. 4 Issue: 3, 232-248.
[8] Kavishe, N., Jefferson, I., & Chileshe, N. (2018). Evaluating issues and outcomes associated with public–private partnership housing project delivery: Tanzanian practitioners’ preliminary observations. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT DOI: 10.1080/15623599.2018.1435154, 1-16.
[9] Li, B., Akintoye, A., Edwards, P., & Hardcastle, C. (2005 b). Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire survey. Engineering, Construction and Architectural Management, Vol. 12 Issue: 2, 125-148.
[10] Ling, F. Y., & Nguyen, D. S. (2013). Construction waste management in India: an exploratory study. Built Environment Project and Asset Management, Vol. 3 (Issue: 1), pp. 141-156.
[11] Liu, T., & Wilkinson, S. (2011). Adopting innovative procurement techniques Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation Vol. 11 No. 4, 452-469.
[12] Ngoma, S., Mundia, M., & Kaliba, C. (2014). Benefits, Constraints and Risks in Infrastructure Development via Public-Private Partnerships in Zambia. Journal of Construction in Developing Countries, 19 (1), 15–33.
[13] Ochieng, J. A., & Chileshe, N. (2016). Engagement Strategies and Challenges for Adoption of Stakeholder Management Approaches (SMA) In South Australian Construction Industry: Preliminary Observations. Proceedings of the 32nd Conference, 5-7 September 2016 (pp. 921-930). Manchester, UK: Association of Researchers in Construction Management, Vol 2.
[14] Osei-Kyei, R., & Chan, A. P. (2017). Factors attracting private sector investments in public–private partnerships in developing countries: A survey of international experts. Journal of Financial Management of Property and Construction Vol. 22 Issue: 1,, 92-111.
[15] Sharma, C. (2012). Determinants of PPP in infrastructure in developing economies. Transforming Government: People, Process and Policy, Vol. 6 Iss 2 pp., 149 - 166.
[16] Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education. 2011; 2: ISSN: 2042-6372, 53-55.
[17] Zhang, X. (2004). Concessionaire Selection: Methods and Criteria. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT 130 (2):© ASCE / MARCH/APRIL, 235-244.
[18] Aibinu, A. A., & Odeyinka, H. A. (2006). Construction Delays and Their Causative Factors in Nigeria. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 132 (7), 667-677.
[19] Almarri, K. (2017). Perceptions of the attractive factors for adopting public–private partnerships in the UAE. International Journal of Construction Management, DOI: 10.1080/15623599.2017.1382082, 1-9.
[20] Asubonteng, K. A. (2011). THE POTENTIAL FOR PUBLIC PRIVATE PARTNERSHIP (PPP) IN ETHIOPIA. Addis Ababa: Private Sector Development Hub/Addis Ababa Chamber of Commerce and Sectoral Associations Ethiopia.
[21] Cha, D. W., Chan, A. P., & Choi, T. N. (2010). An empirical survey of the benefits of implementing Pay for Safety Scheme (PFSS) in the Hong Kong construction industry. Journal of Safety Research (JSR), Volume 41 (Issue 5), 433-443.
[22] Chileshe, N., & Kikwasi, G. J. (2014). Risk assessment and management practices (RAMP) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, Vol. 14 (No. 4).
[23] Code, C. (1960). Civil Code of the Empire of Ethiopia Proclamation No. 165 of 1960. Addis Ababa: Berhanenna Selam Printing Press.
[24] Corbetti, E. (2017, December 17). www.thinkgeoenergy.com/wp. Retrieved 07 16, 2018, from http://
[25] CoST. (2016). Aggregation, Analysis and Synthesis of Disclosure and Assurance Reports of construction projects covered by CoST-Ethiopia. Addis Ababa, Ethiopia: Construction Sector Transparency Initiative - Ethiopia.
[26] Cronbach, L. J. (1951). COEFFICIENT ALPHA AND THE INTERNALSTRUCTURE OF TESTS. PSYCHOMETRIKA--VOL. 16, NO. 3, 297-333.
[27] Demissie, H. J. (2006). Public Private Partnership in Road Projects in Ethiopia, Public Contracting and Administration of Road Projects and the Ethiopian Roads Authority. Thesis, Berlin.
[28] ERA. (2016). ROAD SECTOR DEVELOPMENT PROGRAM 19 YEARS PERFORMANCE ASSESSMENT. Addis Ababa: Ethiopian Roads Authority.
[29] Hinton, P. R., Brownlow, C., McMurray, I., & Cozens, B. (2004). SPSS Explained (Firist edition ed.). London: Routledge.
[30] Holt,, G. D. (2014). Asking questions, analysing answers: relative importance revisited. Construction Innovation, Vol. 14 (Issue: 1), pp. 2-16.
[31] IMF. (2017). THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. International Monetary Fund, IMF Country Report No. 16/322.
[32] Ismail, S. (2014). Factors Attracting the Use of Public Private Partnership in Malaysia. Journal of Economic and Administrative Sciences Vol. 30 No. 2, 82-95.
[33] Kothari, C. (2004). Research Methodology: Methods and Techniques. New Delhi: NEW AGE INTERNATIONAL (P) LIMITED, PUBLISHERS.
[34] Naoum, S. (2013). Dissertation Research & Writing for Construction Students Third Edition. Oxford, UK: Butterworth-Heinemann.
[35] Nunnally, J. C. (1975). Introduction to Statistics for Psychology and Education (1 st Edition ed.). New York, US: McGraw-Hill Book Company.
[36] Pankhurst, R. (2017, 4 20). www.everythingharar.com.
[37] Robert, O. K., Dansoh, A., & Ofori – Kuragu, J. K. (2014). Reasons for adopting Public–Private Partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14: 4, 227-238, DOI: 10.1080/15623599.2014.967925.
[38] Siegel, S., & Castellan, J. (1988). Nonparametric Statistics for the Behavioral Sciences. 2nd Edition (Second Edition ed.). New York.: McGrawHill.
[39] [UNDP. (2015). Prospects of Public- private Partnership (PPP) in Ethiopia. Addis Ababa, Ethiopia: UNDP ETHIOPIA NO. 1/2015
[40] World Bank. (2014). Public-Private Partnerships Reference Guide Version 2. Washington, D. C.: International Bank for Reconstruction and Development / The World Bank, Asian Development Bank, and Inter-American Development Bank.
[41] Zewde, B. (2002). A history of Modern Ethiopia 1855 - 1991 Second Edition. Addis Ababa: Addis Ababa University Press.
Cite This Article
  • APA Style

    Getachew Yilma Debela. (2019). Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia. Journal of Civil, Construction and Environmental Engineering, 4(3), 59-68. https://doi.org/10.11648/j.jccee.20190403.11

    Copy | Download

    ACS Style

    Getachew Yilma Debela. Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia. J. Civ. Constr. Environ. Eng. 2019, 4(3), 59-68. doi: 10.11648/j.jccee.20190403.11

    Copy | Download

    AMA Style

    Getachew Yilma Debela. Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia. J Civ Constr Environ Eng. 2019;4(3):59-68. doi: 10.11648/j.jccee.20190403.11

    Copy | Download

  • @article{10.11648/j.jccee.20190403.11,
      author = {Getachew Yilma Debela},
      title = {Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia},
      journal = {Journal of Civil, Construction and Environmental Engineering},
      volume = {4},
      number = {3},
      pages = {59-68},
      doi = {10.11648/j.jccee.20190403.11},
      url = {https://doi.org/10.11648/j.jccee.20190403.11},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jccee.20190403.11},
      abstract = {The private sector has long been involved in delivering public sector projects in Ethiopia but its role limited as consultant and contractor for the government. Over recent years, the interest in adopting Public Private Partnership (PPP) has increased internationally. Many research outcomes have presented positive reasons for the governments and the private sector to welcome this form of long term contract arrangement, rather than continue involving in the traditional procurement methods. This paper aims to explore the attractive factors for PPP implementation in the Ethiopian road sector. A questionnaire survey was conducted in Ethiopia and survey respondents were invited to rate their perceptions on the importance of seventeen different attractive factors identified. The results show that the five important attractive factors for pursuing PPP in the Ethiopian road sector are: ‘solve the problem of public sector budget restraint’, ‘facilitate creative and innovative approaches’, ‘save time in delivering the project’, ‘improve maintainability’ and ‘enhance government integrated solution capacity’. The research outputs contribute to the limited knowledge on PPP practices in Ethiopia by providing empirical evidence on the conditions that are attractive to the introduction of PPP in the road sector.},
     year = {2019}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Attractive Factors of Public Private Partnership (PPP) for Road Projects in Ethiopia
    AU  - Getachew Yilma Debela
    Y1  - 2019/07/23
    PY  - 2019
    N1  - https://doi.org/10.11648/j.jccee.20190403.11
    DO  - 10.11648/j.jccee.20190403.11
    T2  - Journal of Civil, Construction and Environmental Engineering
    JF  - Journal of Civil, Construction and Environmental Engineering
    JO  - Journal of Civil, Construction and Environmental Engineering
    SP  - 59
    EP  - 68
    PB  - Science Publishing Group
    SN  - 2637-3890
    UR  - https://doi.org/10.11648/j.jccee.20190403.11
    AB  - The private sector has long been involved in delivering public sector projects in Ethiopia but its role limited as consultant and contractor for the government. Over recent years, the interest in adopting Public Private Partnership (PPP) has increased internationally. Many research outcomes have presented positive reasons for the governments and the private sector to welcome this form of long term contract arrangement, rather than continue involving in the traditional procurement methods. This paper aims to explore the attractive factors for PPP implementation in the Ethiopian road sector. A questionnaire survey was conducted in Ethiopia and survey respondents were invited to rate their perceptions on the importance of seventeen different attractive factors identified. The results show that the five important attractive factors for pursuing PPP in the Ethiopian road sector are: ‘solve the problem of public sector budget restraint’, ‘facilitate creative and innovative approaches’, ‘save time in delivering the project’, ‘improve maintainability’ and ‘enhance government integrated solution capacity’. The research outputs contribute to the limited knowledge on PPP practices in Ethiopia by providing empirical evidence on the conditions that are attractive to the introduction of PPP in the road sector.
    VL  - 4
    IS  - 3
    ER  - 

    Copy | Download

Author Information
  • Department of Civil Engineering, University of Birmingham, Birmingham, UK

  • Sections