Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator

Received: 19 February 2019    Accepted: 9 April 2019    Published: 27 April 2019
Views:       Downloads:
Abstract

After Unit 2 is put into operation, the oil leakage in the middle of the steam and excitation ends of the generator is relatively large, which affects the safety of production. The causes of oil leakage are analyzed, and temporary measures are taken to prevent major equipment damage during operation. Taking advantage of the opportunity of unit maintenance, the upper end cap of generator steam end and excitation end is disintegrated. It is found that the middle side sealant strip is not filled, which causes insufficient deformation of the sealant strip. The gap between oil seal, oil holder and sealing bush is repaired and adjusted. In the process of overhaul, the organization, safety and technical measures are strictly implemented, and the "four-stage" acceptance is carried out to completely eliminate the oil leakage of turbogenerator.

Published in Asia-Pacific Journal of Energy and Power Engineering (Volume 1, Issue 1)
Page(s) 1-4
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Previous article
Keywords

Turbogenerator, Steam End Excitation End, Oil Spill, Seal

References
[1] 孙开元等.机械密封结构图例及应用.北京.化学工业出版社.2017.6.
[2] 冯小健等.东方电气集团东方发电机有限公司汽轮发电机运行说明书.四川:2017.4.
[3] 冯小健等.东方电气集团东方发电机有限公司汽轮发电机维护与检修说明书.四川:2017.4.
[4] 袁丁等.东方电气集团东方发电机有限公司300MW/330MW/350MW汽轮发电机安装说明书.四川:2016.4.
[5] 黄俊荣等.广西华磊新材料有限公司发电厂电气一次检修规程.广西:2018.7.
[6] 戴懿等.广西华磊新材料有限公司发电厂主机运行规程.广西:2017.6.
[7] 潘世权.汽轮发电机组轴承油档漏油原因及采取对策.全国火电大机组(300MW级)竞赛第37届年会论文集.2014.361-365.
[8] 吴少伟主编.超超临界火电机组运行.北京:中国电力出版社,2012.11.
[9] 《汽轮机检修》编委会.汽轮机检修.北京:中国电力出版社,2010.4.
[10] 郭延秋编.大型火电机组检修实用技术丛书 发电机分册.北京:中国电力出版社,2003.9.
[11] 杨贵恒等编.发电机组维修技术.北京:化学工业出版社,2007.7.
[12] 涂光瑜主编.汽轮发电机及电气设备.北京:中国电力出版社,2007.6.
Cite This Article
  • APA Style

    Li Jianjun. (2019). Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator. Asia-Pacific Journal of Energy and Power Engineering, 1(1), 1-4.

    Copy | Download

    ACS Style

    Li Jianjun. Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator. Asia-Pac. J. Energy Power Eng. 2019, 1(1), 1-4.

    Copy | Download

    AMA Style

    Li Jianjun. Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator. Asia-Pac J Energy Power Eng. 2019;1(1):1-4.

    Copy | Download

  • @article{10037657,
      author = {Li Jianjun},
      title = {Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator},
      journal = {Asia-Pacific Journal of Energy and Power Engineering},
      volume = {1},
      number = {1},
      pages = {1-4},
      url = {https://www.sciencepublishinggroup.com/article/10037657},
      abstract = {After Unit 2 is put into operation, the oil leakage in the middle of the steam and excitation ends of the generator is relatively large, which affects the safety of production. The causes of oil leakage are analyzed, and temporary measures are taken to prevent major equipment damage during operation. Taking advantage of the opportunity of unit maintenance, the upper end cap of generator steam end and excitation end is disintegrated. It is found that the middle side sealant strip is not filled, which causes insufficient deformation of the sealant strip. The gap between oil seal, oil holder and sealing bush is repaired and adjusted. In the process of overhaul, the organization, safety and technical measures are strictly implemented, and the "four-stage" acceptance is carried out to completely eliminate the oil leakage of turbogenerator.},
     year = {2019}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Analysis and Treatment of Oil Leakage at Turbine End Excitation End of a Generator
    AU  - Li Jianjun
    Y1  - 2019/04/27
    PY  - 2019
    T2  - Asia-Pacific Journal of Energy and Power Engineering
    JF  - Asia-Pacific Journal of Energy and Power Engineering
    JO  - Asia-Pacific Journal of Energy and Power Engineering
    SP  - 1
    EP  - 4
    PB  - Science Publishing Group
    UR  - http://www.sciencepg.com/article/10037657
    AB  - After Unit 2 is put into operation, the oil leakage in the middle of the steam and excitation ends of the generator is relatively large, which affects the safety of production. The causes of oil leakage are analyzed, and temporary measures are taken to prevent major equipment damage during operation. Taking advantage of the opportunity of unit maintenance, the upper end cap of generator steam end and excitation end is disintegrated. It is found that the middle side sealant strip is not filled, which causes insufficient deformation of the sealant strip. The gap between oil seal, oil holder and sealing bush is repaired and adjusted. In the process of overhaul, the organization, safety and technical measures are strictly implemented, and the "four-stage" acceptance is carried out to completely eliminate the oil leakage of turbogenerator.
    VL  - 1
    IS  - 1
    ER  - 

    Copy | Download

Author Information
  • Guangxi Hualei New Materials Co., Ltd., Basei, China

  • Sections