Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway

Received: 29 August 2019    Accepted: 17 October 2019    Published: 29 October 2019
Views:       Downloads:
Abstract

The main bridge of Guanting Bridge on Beijing-Zhangzhou High Speed Railway, The design adopts 8-hole 110m arch deformed high simply supported steel truss beam, According to the characteristics and reality of the project, This paper mainly studies the selection of jacking construction scheme from numerous erection and installation schemes of simply supported steel truss beams; Emphasis is placed on the comparison and optimization of the two pushing schemes, Finally, the implementation scheme of unilateral multi-point push-up is determined; The main construction steps and key points are also introduced, It is worthy of reference and reference for similar projects in the future.

Published in Asia-Pacific Journal of Civil Engineering and Architecture (Volume 1, Issue 2)
Page(s) 15-20
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

High Speed Rail, Guanting Bridge, Steel Beams, Establishment Programme, Competition

References
[1] TB10002.2-2005,铁路桥梁钢结构设计规范[S]. TB10002.2-2005,Code for Design of Steel Structure of Railway Bridges [S].
[2] Q/CR9603-2015,高速铁路桥涵工程施工技术规程[S].Q/CR9603-2015,echnical Specification for Construction of Bridge and Culvert Engineering of High Speed Railway [S].
[3] 方继,丁仕洪,张时利,等.郑济黄河公铁两用桥带加劲弦顶推施工技术[J].桥梁建设,2016,46(6):20-24 Fang Ji, Ding Shihong, Zhang Shili, et al. Construction technology of stiffening strings for Zhengji Yellow River Railway and Highway Bridge [J]. Bridge construction, 2016, 46 (6): 20-24.
[4] 刘应龙,蔺鹏臻,何志刚.银西高铁银川机场黄河特大桥钢桁梁施工技术[J].桥梁建设,2018,48(5):115-116 Liu Yinglong, Lin Pengzhen, He Zhigang. Construction Technology of Steel Truss Girder of Yinchuan Airport Yellow River Bridge on Yinxi High-speed Railway [J]. Bridge Construction, 2018, 48 (5): 115-116.
[5] 张晓东.桥梁顶推施工技术[J].公路,2003(9):通45-51. ZHANG Xiao-dong, incremental Launching Construction Technology of Bridge [J]. Highway, 2003 (9): 45-51.
[6] ROSIGNOLI M. Prestressing Schemes for Incrementally Launched Bridges [J]. Journal of Bridge Engineering, 1999, 4 (2): 107-115.
[7] 田仲初,张华平.顶推施工中导梁的合理配置[J].世界桥梁,2005 (4): 41-43, 47. TIAN Zhong-chu,ZHANG Hua-ping. Reasonable Arrangement of Launching Nose in Incremental Launching Construction [J]. World Bridges, 2005 (4): 41-43,47.
[8] TB10752-2010,高速铁路桥涵工程施工质量验收标准[S].TB10752-2010, Acceptance Standard for Construction Quality of High Speed Railway Bridge and Culvert Project [S].
[9] 季强.公安长江公铁两用特大桥非通航孔钢桁梁架设技术[J].桥梁建设, 2017, 47(2):115-116 Ji Qiang. Erection Technology of Non-navigable Steel Truss Girder for Public Security Yangtze River Railway and Public Security Bridge [J]. Bridge Construction, 2017, 47 (2): 115-116
[10] 国洪光,何天涛,彭 哲.新白沙沱长江大桥钢桁梁跨既有线顶推施工技术[J].世界桥梁,2016,44(3):Guohongguang, He Tiantao, Peng Zhe. Pushing Construction Technology of Steel Truss Girder of New Baishatuo Yangtze River Bridge across Existing Lines [J]. World Bridge, 2016, 44 (3):
[11] 杨庆琪.跨越多层立交大跨径、宽截面钢箱梁整体式顶推施工技术[J].世界桥梁,2015,43(4):20-24 Yang Qingqi. Integral pushing construction technology of long-span and wide-section steel box girder across multi-storey interchange [J]. World Bridge, 2015, 43 (4): 20-24
[12] 邵长宇.九堡大桥组合结构桥梁的技术构思与特色[J].桥梁建设, 2009 (6): 42-45. SHAO Chang-yu. Technical Consideration and Features of Composite Structure Bridge of Jiubao Bridge in Hangzhou [J]. Bridge Construction, 2009 (6): 42-45.
[13] 王卫锋,林俊锋,马文田.桥梁顶推施工导梁的优化分析[J].工程力学,2007,24(2):132-138. WANG Wei-feng,LIN Jun-feng,MA Wen-tian.Optimum Analysis of Launching Nose During Incremental Launching Construction of Bridge [J]. Engineering Mechanics, 2007, 24 (2): 132-138.
[14] 向中富.桥梁施工控制技术[M].北京:人民交通出版社,2001. XIANG Zhong-fu. Bridge Construction Control Technique [M]. Beijing: China Communications Press, 2001.
[15] 刘树爱.顶推施工阶段内力分析及临时结构设计[J].石家庄铁道学院学报,1998,11(增): 1-5. LlU Shu-ai. Structural Analysis and Construction Design of Prestressed Concrete Continuous Beam at Construction Stage [J]. Journal of Shijiazhuang Railway Institute, 1998, 11 (S): 1-5.
Cite This Article
  • APA Style

    Yang Qi Hai, Cai Deng Shan. (2019). Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway. Asia-Pacific Journal of Civil Engineering and Architecture, 1(2), 15-20.

    Copy | Download

    ACS Style

    Yang Qi Hai; Cai Deng Shan. Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway. Asia-Pac. J. Civ. Eng. Archit. 2019, 1(2), 15-20.

    Copy | Download

    AMA Style

    Yang Qi Hai, Cai Deng Shan. Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway. Asia-Pac J Civ Eng Archit. 2019;1(2):15-20.

    Copy | Download

  • @article{10042736,
      author = {Yang Qi Hai and Cai Deng Shan},
      title = {Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway},
      journal = {Asia-Pacific Journal of Civil Engineering and Architecture},
      volume = {1},
      number = {2},
      pages = {15-20},
      url = {https://www.sciencepublishinggroup.com/article/10042736},
      abstract = {The main bridge of Guanting Bridge on Beijing-Zhangzhou High Speed Railway, The design adopts 8-hole 110m arch deformed high simply supported steel truss beam, According to the characteristics and reality of the project, This paper mainly studies the selection of jacking construction scheme from numerous erection and installation schemes of simply supported steel truss beams; Emphasis is placed on the comparison and optimization of the two pushing schemes, Finally, the implementation scheme of unilateral multi-point push-up is determined; The main construction steps and key points are also introduced, It is worthy of reference and reference for similar projects in the future.},
     year = {2019}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Comparison and Selection of Steel Truss Girder Erection Schemes for Guanting Extra-large Bridge of Beijing-Zhangzhou High Speed Railway
    AU  - Yang Qi Hai
    AU  - Cai Deng Shan
    Y1  - 2019/10/29
    PY  - 2019
    T2  - Asia-Pacific Journal of Civil Engineering and Architecture
    JF  - Asia-Pacific Journal of Civil Engineering and Architecture
    JO  - Asia-Pacific Journal of Civil Engineering and Architecture
    SP  - 15
    EP  - 20
    PB  - Science Publishing Group
    UR  - http://www.sciencepg.com/article/10042736
    AB  - The main bridge of Guanting Bridge on Beijing-Zhangzhou High Speed Railway, The design adopts 8-hole 110m arch deformed high simply supported steel truss beam, According to the characteristics and reality of the project, This paper mainly studies the selection of jacking construction scheme from numerous erection and installation schemes of simply supported steel truss beams; Emphasis is placed on the comparison and optimization of the two pushing schemes, Finally, the implementation scheme of unilateral multi-point push-up is determined; The main construction steps and key points are also introduced, It is worthy of reference and reference for similar projects in the future.
    VL  - 1
    IS  - 2
    ER  - 

    Copy | Download

Author Information
  • China Railway Bridge Bureau Group Co., Wuhan, China

  • China Railway Bridge Bureau Group Co., Wuhan, China

  • Sections