Yanqi Wu,Xianglin Wu,Jun Chen,Zonyuan Ding,Xiuwen Li
Issue:
Volume 1, Issue 2, June 2019
Pages:
11-14
Received:
16 May 2019
Accepted:
4 December 2019
Published:
3 March 2020
Downloads:
Views:
Abstract: The design scale of a sewage treatment plant in Xuzhou City, Jiangsu Province is 50000 m3 / d, It is divided into phase I and phase II. In the first stage, "A2 / O" treatment process is adopted, and in the second stage, "pre denitrification + A2 / O" treatment process is adopted. In 2017 and 2018, the author tracked the first phase process operation of the plant and proposed the basic ways of energy saving and consumption reduction. This paper analyzes the first stage process and the implementation of the on-site energy-saving measures, achieving better results. The basic technological process, the design parameters of structures and the analysis of energy saving and consumption reduction measures implemented on the premise of ensuring the stability of effluent.Abstract: The design scale of a sewage treatment plant in Xuzhou City, Jiangsu Province is 50000 m3 / d, It is divided into phase I and phase II. In the first stage, "A2 / O" treatment process is adopted, and in the second stage, "pre denitrification + A2 / O" treatment process is adopted. In 2017 and 2018, the author tracked the first phase process operatio...Show More