| Peer-Reviewed

Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine

Received: 29 November 2022    Accepted: 26 December 2022    Published: 28 December 2022
Views:       Downloads:
Abstract

With the promotion of urbanization and the development of industrial construction, the construction industry in our country is in a period of rapid development. Modular prefabricated buildings can promote the development of construction industrialization including standardized design, factory production, on-site construction assembly, integrated decoration and construction, and informatization of on-site management. From the end of 2019 to now, the COVID-19 has posed great challenges to world public health security. The research group proposed a holistic solution of the design concepts of modular membrane combination and container mold combination, it is base on the rapid construction integration technology of modular prefabricated building for epidemic prevention and medical treatment. Combined with the construction of air membrane isolation ward and shelter hospital, the concept of five-dimensional BIM is proposed. The design process of integration of architectural design and construction is summarized. The research group has conducted a systematic study on the rapid construction integration technology of modular prefabricated building for epidemic prevention medical treatment, aiming to organically integrate modular prefabricated building, epidemic prevention medical building and other technologies. And through the application of the integrated technology in 3 engineering cases, the overall can meet the requirements of rapid construction of emergency epidemic prevention.

Published in Science Discovery (Volume 10, Issue 6)
DOI 10.11648/j.sd.20221006.35
Page(s) 542-552
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Industrial Building, Novel Coronavirus, Modular Assembly, Integration

References
[1] 王华, 沙皓月. 建筑工业化发展的多群体演化博弈与仿真研究 [J]. 工程管理学报, 2022, 36 (05): 7-12.
[2] 杨青清. 装配式建筑的多样化设计策略研究 [D]. 重庆大学, 2021.
[3] 方丽, 张余力. 建筑工业化的城镇住宅建造设计 [J]. 建筑结构, 2020, 50 (22): 173.
[4] 王俊, 赵基达, 胡宗羽. 我国建筑工业化发展现状与思考 [J]. 土木工程学报, 2016, 49 (05): 1-8.
[5] COVID-19 Dashboard [EB/OL]. the Center for Systems Science and Engineering (CSSE) at Johns Hopkins University (JHU). https://coronavirus.jhu.edu/map.html, 2021.
[6] 苏运升, 陈戊荣, 陈兆荣, 程希寒. 应急防疫气膜系统设计研究与实践 [J]. 装饰, 2022, (08): 12-16.
[7] 陈戊荣, 陈兆荣, 苏运升, 李雯琪, 尹烨, 李若羽. 超短临时建筑核酸检测实验室设计若干技术研究 [J]. 建筑结构, 2022, 52 (S1): 704-708.
[8] 甘金芳, 刘妙娜. 浅谈中央援港应急医院药房筹建及管理 [J]. 今日药学: 1-7.
[9] 陈兵, 刘效辉, 赵林, 李龙军, 顾安曼, 伊洪莉, 闫根全, 刘可可. 2022年上海市某方舱医院收治的3054例新冠轻型/无症状感染病例的流行病学特征 [J]. 中华医院感染学杂志, 2022, (24): 3681-3686.
[10] 张方琪, 刘海潮, 屈磊, 杨亚伟, 翁雁鸣, 方瑶. 上海会展中心方舱医院新型冠状病毒奥密克戎变异株感染者临床分析 [J]. 中国热带医学: 1-8.
[11] 陈戊荣, 陈兆荣, 苏运升, 李雯琪, 尹烨, 温丽娟, 李若羽, 陈唯军. 核酸检测实验室建筑关键技术发展研究 [A]. 《施工技术 (中英文)》杂志社、亚太建设科技信息研究院有限公司. 2022年全国工程建设行业施工技术交流会论文集 (下册) [C]. 《施工技术 (中英文)》杂志社、亚太建设科技信息研究院有限公司: 施工技术编辑部, 2022: 628-632.
[12] 陈戊荣, 陈兆荣, 苏运升, 李雯琪, 尹烨, 温丽娟, 李若羽, 陈唯军. 气膜性建筑结构核酸检测实验室的创新设计研究 [J]. 建筑结构, 2022, 52 (S1): 698-703
[13] 陈兆荣, 蔡志立, 白忠奎. 高层建筑转换层满跨墙下梁柱受力性能研究及工程案例 [J]. 建筑结构, 2021, 51 (S2): 122-128.
[14] 陈兆荣, 潘东辉, 魏春玲, 刘波, 徐新星. 高层建筑框筒结构层受剪承载力计算方法研究 [J]. 华南地震, 2018, 38 (01): 120-124.
[15] 刘珊, 王贵峰. 提升边境口岸网络覆盖能力 为方舱医院新建4G、5G基站 黑龙江通信业全力做好绥芬河口岸及方舱医院疫情防控通信保障 [J]. 通信管理与技术, 2020, (02): 4-5.
[16] 王炳南, 程正祥. 方舱医院发展与研究展望 [J]. 医疗卫生装备, 2012, 33 (01): 92-93+96.
[17] 谭树林, 刘亚军, 孙景工. 应急医学救援方舱医院装备研究进展 [J]. 医疗卫生装备, 2011, 32 (09): 78-79+85.
[18] 何俊翘, 赵鸿彬, 吴建良. 装配式管廊接缝渗水监测技术研究 [J]. 广州建筑, 2021, 49 (06): 14-17.
[19] 欧阳志鹏, 孙彬, 王霓, 吴明娅. 装配式结构混凝土结合面抗渗性能试验研究 [J]. 建筑结构, 2020, 50 (09): 21-25+31.
Cite This Article
  • APA Style

    Liao Fei, Chen Zhaorong, Chen Wurong, Li Bo, Zeng Changluo, et al. (2022). Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine. Science Discovery, 10(6), 542-552. https://doi.org/10.11648/j.sd.20221006.35

    Copy | Download

    ACS Style

    Liao Fei; Chen Zhaorong; Chen Wurong; Li Bo; Zeng Changluo, et al. Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine. Sci. Discov. 2022, 10(6), 542-552. doi: 10.11648/j.sd.20221006.35

    Copy | Download

    AMA Style

    Liao Fei, Chen Zhaorong, Chen Wurong, Li Bo, Zeng Changluo, et al. Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine. Sci Discov. 2022;10(6):542-552. doi: 10.11648/j.sd.20221006.35

    Copy | Download

  • @article{10.11648/j.sd.20221006.35,
      author = {Liao Fei and Chen Zhaorong and Chen Wurong and Li Bo and Zeng Changluo and Yin Ye},
      title = {Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine},
      journal = {Science Discovery},
      volume = {10},
      number = {6},
      pages = {542-552},
      doi = {10.11648/j.sd.20221006.35},
      url = {https://doi.org/10.11648/j.sd.20221006.35},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.sd.20221006.35},
      abstract = {With the promotion of urbanization and the development of industrial construction, the construction industry in our country is in a period of rapid development. Modular prefabricated buildings can promote the development of construction industrialization including standardized design, factory production, on-site construction assembly, integrated decoration and construction, and informatization of on-site management. From the end of 2019 to now, the COVID-19 has posed great challenges to world public health security. The research group proposed a holistic solution of the design concepts of modular membrane combination and container mold combination, it is base on the rapid construction integration technology of modular prefabricated building for epidemic prevention and medical treatment. Combined with the construction of air membrane isolation ward and shelter hospital, the concept of five-dimensional BIM is proposed. The design process of integration of architectural design and construction is summarized. The research group has conducted a systematic study on the rapid construction integration technology of modular prefabricated building for epidemic prevention medical treatment, aiming to organically integrate modular prefabricated building, epidemic prevention medical building and other technologies. And through the application of the integrated technology in 3 engineering cases, the overall can meet the requirements of rapid construction of emergency epidemic prevention.},
     year = {2022}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Integrated Technology and Engineering Case of Rapid Construction of Modular Prefabricated Building for Anti-epidemic Medicine
    AU  - Liao Fei
    AU  - Chen Zhaorong
    AU  - Chen Wurong
    AU  - Li Bo
    AU  - Zeng Changluo
    AU  - Yin Ye
    Y1  - 2022/12/28
    PY  - 2022
    N1  - https://doi.org/10.11648/j.sd.20221006.35
    DO  - 10.11648/j.sd.20221006.35
    T2  - Science Discovery
    JF  - Science Discovery
    JO  - Science Discovery
    SP  - 542
    EP  - 552
    PB  - Science Publishing Group
    SN  - 2331-0650
    UR  - https://doi.org/10.11648/j.sd.20221006.35
    AB  - With the promotion of urbanization and the development of industrial construction, the construction industry in our country is in a period of rapid development. Modular prefabricated buildings can promote the development of construction industrialization including standardized design, factory production, on-site construction assembly, integrated decoration and construction, and informatization of on-site management. From the end of 2019 to now, the COVID-19 has posed great challenges to world public health security. The research group proposed a holistic solution of the design concepts of modular membrane combination and container mold combination, it is base on the rapid construction integration technology of modular prefabricated building for epidemic prevention and medical treatment. Combined with the construction of air membrane isolation ward and shelter hospital, the concept of five-dimensional BIM is proposed. The design process of integration of architectural design and construction is summarized. The research group has conducted a systematic study on the rapid construction integration technology of modular prefabricated building for epidemic prevention medical treatment, aiming to organically integrate modular prefabricated building, epidemic prevention medical building and other technologies. And through the application of the integrated technology in 3 engineering cases, the overall can meet the requirements of rapid construction of emergency epidemic prevention.
    VL  - 10
    IS  - 6
    ER  - 

    Copy | Download

Author Information
  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd., Changsha, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd., Changsha, China

  • BGI Genomics Co., Ltd, Shenzhen, China

  • Shenzhen Construction Engineering Quality and Safety Supervision Station, Shenzhen, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd., Changsha, China

  • BGI Genomics Co., Ltd, Shenzhen, China

  • Sections